Jump to navigationJump to search (Created page with "Temp sensors https://logbooks.jlab.org/entry/4232489") |
|||
Line 1: | Line 1: | ||
− | Temp | + | = RC Meeting Information = |
− | https://logbooks.jlab.org/entry/4232489 | + | |
+ | <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | ||
+ | * Zoom remote connection information: https://logbooks.jlab.org/entry/4229331 | ||
+ | * RC meeting today | ||
+ | * | ||
+ | = Useful Links = | ||
+ | |||
+ | * [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=DVCS-NPS-2023 Shift Signup ('''Read only''')] | ||
+ | ** [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=DVCS-NPS-2023 Shift Signup] | ||
+ | |||
+ | * [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls] | ||
+ | * [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | ||
+ | * [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Daily RC Reports] | ||
+ | |||
+ | = Current Status = | ||
+ | * Production on KinC_x50_2 and _2'. | ||
+ | * Saturday 09 Dec: 07:00-09:00 Separator repair work. Beam restored to HallC ~ 09:30 | ||
+ | * Sunday 10 Dec: HMS Q3 & Dipole tripped at 11:19 (run 3510) Restored directed to set points (Run 3511, 3512) Ramped to MOL and back to set point at 14:00 | ||
+ | |||
+ | = Current Run Plan = | ||
+ | * Continue run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan | ||
+ | ** cycle KinC_x50_2 then KinC_x50_2' | ||
+ | ** Only need four 1-hour production runs on LD2 for each cycle of each setting. | ||
+ | |||
+ | = Notices in Effect for Shift Crew = | ||
+ | * All shifts should come in as planned. | ||
+ | * Heidi on vacation 7-13 Dec. Contact Steve L for cryo during that time. | ||
+ | ** cc Heidi & Steve Lassiter on any cryo logbook entry (fansler@jlab.org, lassiter@jlab.org) | ||
+ | * Physically verify green led of gas flow and BCM temps in electronics room | ||
+ | * Record HMS (electron) tracking efficiency from each 50K replay report | ||
+ | |||
+ | = Current Issues = | ||
+ | * On call list seems incomplete and should be addressed by the Hall: https://logbooks.jlab.org/entry/4230495 | ||
+ | * We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept. | ||
+ | * NPS PMT/Base failures are propagating into columns 9, 10, 11, 12 | ||
+ | * Calo Temp sensor interface failed yesterday around 16:30. | ||
+ | ** Remote restart by Aaron Brown not successful | ||
+ | ** Access to Hall, Unplugged and replugged AC power https://logbooks.jlab.org/entry/4232489 | ||
+ | ** Beam recovery took another ~2 hours | ||
+ | |||
+ | |||
+ | |||
+ | = Planned Access to the Hall = | ||
+ | * perhaps opportunistic access Monday to disconnect some noisy signal cables to FADC from empty channels. | ||
+ | |||
+ | = Planned Accelerator Configuration Changes = | ||
+ | * We will run until 07:00 Dec 15. | ||
+ | ** Target will be warmed up and parked. | ||
+ | ** Hall will remain in Controlled Access until 07:00 Dec 19 | ||
+ | ** Beam studies (Day Shift) Dec 19 will send beam into hall | ||
+ | ** Hall will return to Controlled Access at 16:00 on Dec 19 | ||
+ | |||
+ | = Special Requests = | ||
+ | * Plan for Moller Dec 13 or 14 (single HWP setting) | ||
+ | * Calorimeter energy resolution studies | ||
+ | ** Analyze pi0 mass resolution as a function of pi0 energy | ||
+ | ** Analyze pi0 mass resolution separately for high current and low current runs |
Revision as of 07:11, 11 December 2023
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information: https://logbooks.jlab.org/entry/4229331
- RC meeting today
Useful Links
Current Status
- Production on KinC_x50_2 and _2'.
- Saturday 09 Dec: 07:00-09:00 Separator repair work. Beam restored to HallC ~ 09:30
- Sunday 10 Dec: HMS Q3 & Dipole tripped at 11:19 (run 3510) Restored directed to set points (Run 3511, 3512) Ramped to MOL and back to set point at 14:00
Current Run Plan
- Continue run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
- cycle KinC_x50_2 then KinC_x50_2'
- Only need four 1-hour production runs on LD2 for each cycle of each setting.
Notices in Effect for Shift Crew
- All shifts should come in as planned.
- Heidi on vacation 7-13 Dec. Contact Steve L for cryo during that time.
- cc Heidi & Steve Lassiter on any cryo logbook entry (fansler@jlab.org, lassiter@jlab.org)
- Physically verify green led of gas flow and BCM temps in electronics room
- Record HMS (electron) tracking efficiency from each 50K replay report
Current Issues
- On call list seems incomplete and should be addressed by the Hall: https://logbooks.jlab.org/entry/4230495
- We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
- NPS PMT/Base failures are propagating into columns 9, 10, 11, 12
- Calo Temp sensor interface failed yesterday around 16:30.
- Remote restart by Aaron Brown not successful
- Access to Hall, Unplugged and replugged AC power https://logbooks.jlab.org/entry/4232489
- Beam recovery took another ~2 hours
Planned Access to the Hall
- perhaps opportunistic access Monday to disconnect some noisy signal cables to FADC from empty channels.
Planned Accelerator Configuration Changes
- We will run until 07:00 Dec 15.
- Target will be warmed up and parked.
- Hall will remain in Controlled Access until 07:00 Dec 19
- Beam studies (Day Shift) Dec 19 will send beam into hall
- Hall will return to Controlled Access at 16:00 on Dec 19
Special Requests
- Plan for Moller Dec 13 or 14 (single HWP setting)
- Calorimeter energy resolution studies
- Analyze pi0 mass resolution as a function of pi0 energy
- Analyze pi0 mass resolution separately for high current and low current runs