Difference between revisions of "February 22, 2024"
From HallCWiki
Jump to navigationJump to searchLine 28: | Line 28: | ||
= Notices in Effect for Shift Crew = | = Notices in Effect for Shift Crew = | ||
* SL Day, Swing today and Friday Owl canceled | * SL Day, Swing today and Friday Owl canceled | ||
+ | * All TO should report to their shift | ||
* Looking for Swing TO to take over from NPS students | * Looking for Swing TO to take over from NPS students | ||
* IHWP change instruction: https://hallcweb.jlab.org/wiki/index.php/Hall_C_IHWP_Change_Procedure | * IHWP change instruction: https://hallcweb.jlab.org/wiki/index.php/Hall_C_IHWP_Change_Procedure |
Latest revision as of 10:57, 22 February 2024
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
- Meeting ID: 161 701 5555
- Passcode: 288953
Useful Links
Accelerator status
- Beam off at 5am this morning; 1L24-7 HV drop. Beam back to Hall B, we are in controlled access since 8am.
- Maintenance + Beam study next Wednesday
Current Run Plan
- Continue run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
- cycle KinC_x60_4a, KinC_x60_4b finished. Ran with a reduced plan for Swing and Owl.
- Beam off 5:00 am this morning. Working on column 24 & 25 today.
- Switch to KinC_x36_6 Friday morning. Starting with setting up the corrector coils. Test plan is added to the MCC shift plan.
Notices in Effect for Shift Crew
- SL Day, Swing today and Friday Owl canceled
- All TO should report to their shift
- Looking for Swing TO to take over from NPS students
- IHWP change instruction: https://hallcweb.jlab.org/wiki/index.php/Hall_C_IHWP_Change_Procedure
Current Issues
- NPS crate #2 drops occasionally
Planned Access to the Hall
- NPS column 24,25 refurbishment
- Removing Pb shield
- Heidi has a list of small items (opportunistic when there is a key available)
- Daniel Moser will check one of the Moller quad
- Checking the water flow rate issue of QF3M01 (https://logbooks.jlab.org/entry/4255237) -- completed, adjusted the flow meter.
- Spectrometer rotation around 1:30pm, takes 0.5-1h if everything goes well
Special Requests
- Guard house work from next Monday. Pay attention to the sign and follow the directions around there when coming to the accelerator site.