= Hall status =  
+
= Summary =  
 
* Completed Carbon DIS data taking
 
* Completed Carbon DIS data taking
 
* Completed two cycles of Positron data taking
 
* Completed two cycles of Positron data taking
Line 30: Line 30:
 
* MCC will give us 1h heads up before they need the Hall C in beam permit
 
* MCC will give us 1h heads up before they need the Hall C in beam permit
  
= Accelerator status =
 
* Maintenance + Beam study (https://logbooks.jlab.org/entry/4258072)
 
** Beam off at 7am
 
** Maintenance till around noon
 
** Beam study till 19:30pm
 
** Beam to the halls, ~21:00pm
 
** Scheduled can be shifted a bit depending on how things go..
 
  
= Planned Access to the Hall =
 
  
* https://logbooks.jlab.org/entry/4258144
 
* NPS: Julie, Josh, Aaron to look at the temperature read back issue
 
* Heidi: checking Dipole (----> DONE)
 
* Hanjie, Alexandre: checking NPS crate fans (---> DONE)
 
* Larry, Jerry, Bob: Pumping SHMS magnets
 
* Bill: SHMS hut temperature sensor --> DONE; Summary: https://logbooks.jlab.org/entry/4258173
 
* Walk-thru at 1pm: Joe + 5 FIU students (6 keys)
 
* Facilities: lowering AC set point to 65F (---> DONE)
 
 
 
* Other work planned during the downtime
 
** Ellen and Heidi: updating magnet software
 
** Hanjie will use the DAQ (will notify the shift crew before/after she is done)
 
  
 
= Current Run Plan =  
 
= Current Run Plan =  

Revision as of 09:56, 29 February 2024

Back to the calendar

RC Meeting Information

Current RC: Iuliia Skorodumina

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

  • Completed Carbon DIS data taking
  • Completed two cycles of Positron data taking
  • Hall needs to be back to beam permit for the last part of the beam study (~around 3-4pm).
  • MCC will give us 1h heads up before they need the Hall C in beam permit



Current Run Plan


Notices in Effect for Shift Crew

Current Issues

  • NPS crate #2 drops occasionally
    • Not much reported recently, taking 30min runs (restarting a new run more often) seems helping
  • NPS crate temperatures

Special Requests

  • Guard house work till Friday. Pay attention to the sign and follow the directions around there when coming to the accelerator site.