Line 38: | Line 38: | ||
* NPS position for the next kinematics setting: | * NPS position for the next kinematics setting: | ||
** 5m vs 6m: https://logbooks.jlab.org/entry/4258150 | ** 5m vs 6m: https://logbooks.jlab.org/entry/4258150 | ||
− | |||
= Current Issues = | = Current Issues = | ||
* NPS crate temperatures | * NPS crate temperatures | ||
+ | |||
+ | = Future plans = | ||
+ | * Monday (08/04): Sweeper wings off (Walter). | ||
+ | * Monday (08/04): Spectrometer rotations: To be done after taking the Wings off. HMS-SHMS separation need to be certified in the hall (Steve L). | ||
+ | * Moller measurement next week (?) |
Revision as of 09:09, 29 February 2024
RC Meeting Information
Current RC: Iuliia Skorodumina
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
- Meeting ID: 161 701 5555
- Passcode: 288953
Useful Links
Summary
Yesterday was the Maintenance Day during the Day shift (https://logbooks.jlab.org/entry/4258304) and during Swing accelerator did some beam studies (https://logbooks.jlab.org/entry/4258458). The beam was restored to the Halls late Swing and we proceeded back to production. We took Dummy runs and then switched to LD2 for the night. Hall B performed the Moller measurements at the end of the Swing shift and then changed IHWP from OUT to IN, after which we ran the flipper script.
We are currently at KinC_x36_6 (NPS Calorimeter at 6.0 m) and going to stay at this kinematics for the next few days. Data taking was smooth overnight without major issues.
Swing shift summary (https://logbooks.jlab.org/entry/4258334). Owl shift summary (https://logbooks.jlab.org/entry/4258486).
Planned Access to the Hall
Julie wants to make an access around noon to repair two NPS channels.
Current Run Plan
- Short-term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
- KinC_x36_6, NPS at 7.5 deg, calorimeter at 6m
- NPS position for the next kinematics setting:
- 5m vs 6m: https://logbooks.jlab.org/entry/4258150
Current Issues
- NPS crate temperatures
Future plans
- Monday (08/04): Sweeper wings off (Walter).
- Monday (08/04): Spectrometer rotations: To be done after taking the Wings off. HMS-SHMS separation need to be certified in the hall (Steve L).
- Moller measurement next week (?)