Difference between revisions of "March 13, 2024"

From HallCWiki
Jump to navigationJump to search
(Created page with "[https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Back to the calendar] = RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in pers...")
 
Line 35: Line 35:
 
= Accelerator =
 
= Accelerator =
  
Maintenance day today (https://logbooks.jlab.org/entry/4265990) they expect beam to be back for halls at ~21:00.
+
Maintenance day today with option of beam studies in INJ (https://logbooks.jlab.org/entry/4265990).
 +
Expect beam back for halls at ~21:00.
  
 
= Run Plan =  
 
= Run Plan =  
 
* We are in KinC_x36_4, NPS angle is 11.200 deg and NPS is at 4 m.
 
* We are in KinC_x36_4, NPS angle is 11.200 deg and NPS is at 4 m.
 
* Short-term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
 
* Short-term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan

Revision as of 09:16, 13 March 2024

Back to the calendar

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

  • Short term run plan [1]

Summary

RC update 13th March: https://logbooks.jlab.org/entry/4265984


Planned Access to the Hall

Maintenance day today

Hall C is in Controlled access. We plan the following work in the Hall:

  • NPS crew
  • techs doing property inventory and retrieving some slings
  • Possible walk through?

Accelerator

Maintenance day today with option of beam studies in INJ (https://logbooks.jlab.org/entry/4265990). Expect beam back for halls at ~21:00.

Run Plan