Difference between revisions of "March 20, 2024"

From HallCWiki
Jump to: navigation, search
(Run Plan)
(Run Plan)
Line 30: Line 30:
 
* Charles then updated the run plan for the plan after beam return. See new short term run plan (it is updated online)
 
* Charles then updated the run plan for the plan after beam return. See new short term run plan (it is updated online)
 
* Continue with at 3m and 14.4deg until change to new x60_1 setting.
 
* Continue with at 3m and 14.4deg until change to new x60_1 setting.
* x50_0 ends this Saturday morning. Makes sense to change NPS position then.
+
* x50_0 ends Saturday morning.
* Discussion took place about whether to put NPS at 3m, 3.5m or 4m. Someone would have to drill a hole for 3.5m. So possible plan is start at 3m and perform calibration cross checks at 4m.
+
* Discussion took place about whether to put NPS at 3m, 3.5m or 4m on Sat.
 +
* Have option of taking 4m data at one angle of a and b to give reference to what is happening to crystals.
  
 
= Requests for shift crew =  
 
= Requests for shift crew =  

Revision as of 11:46, 20 March 2024

Back to the calendar

RC Meeting Information

Current RC: Rachel Montgomery (rmontgom@jlab.org)

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

RC update 20th March: https://logbooks.jlab.org/entry/4269634

Planned Access to the Hall

Accelerator

MOmod tests were cancelled this morning due to a hardware issue. They won't plan to try it again any time soon (maybe in something like a couple of weeks).

Run Plan

  • By beam off for Hall C laser issue, we had almost cycled through both b and a settings for KinC_x50_0. We are just missing the last coin run on LD2 for a.
  • Charles then updated the run plan for the plan after beam return. See new short term run plan (it is updated online)
  • Continue with at 3m and 14.4deg until change to new x60_1 setting.
  • x50_0 ends Saturday morning.
  • Discussion took place about whether to put NPS at 3m, 3.5m or 4m on Sat.
  • Have option of taking 4m data at one angle of a and b to give reference to what is happening to crystals.

Requests for shift crew

  • Please post screen shots to HCLOG as prompted in the run plan and of anything else appropriate that happens on shift.

Shift schedule

Looks good until Monday 25th March.