Difference between revisions of "March 25, 2024"

From HallCWiki
Jump to: navigation, search
(Summary)
(Plans)
 
Line 25: Line 25:
 
= Plans=
 
= Plans=
 
*NPS to 3.5 meters
 
*NPS to 3.5 meters
 +
** After last week’s discussion about adding the possibility of moving to an intermediate position of 3.5 meters, RADCON has signed off the proposed plan off drilling a new pinning hole at 3.5 meters.
 +
**Joe Beaufait will lock out the sweep magnet later this morning and the techs will begin working on drill the new hole later this afternoon.

Latest revision as of 10:56, 25 March 2024

RC Meeting Information

Current RC: Michael Nycz (mnycz@jlab.org)

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)


Useful Links

Summary

Plans

  • NPS to 3.5 meters
    • After last week’s discussion about adding the possibility of moving to an intermediate position of 3.5 meters, RADCON has signed off the proposed plan off drilling a new pinning hole at 3.5 meters.
    • Joe Beaufait will lock out the sweep magnet later this morning and the techs will begin working on drill the new hole later this afternoon.