Difference between revisions of "Oct 08 2024"
From HallCWiki
Jump to navigationJump to search (Created page with "Back to Main Page >> Weekly meetings == Agenda == == Notes ==") |
(→Notes) |
||
Line 4: | Line 4: | ||
== Notes == | == Notes == | ||
+ | Updates: | ||
+ | # Both HMS and SHMS DAQ are ready to take cosmic runs | ||
+ | # HMS cosmic looks good (FADC uses Hall D firmware) | ||
+ | # SHMS cosmic TDC and DC look good, but the replay root files don't have FADC events (Hall B firmware), could be the decoder is not set up correctly to decode Hall B firmware | ||
+ | # RHEL9 upgrade preparation is on-going | ||
+ | # Checked with Chris Cuevas: SOLID FADC will probably be available by end of November, and he should have enough SD boards for us now. |
Revision as of 15:03, 9 October 2024
Back to Main Page >> Weekly meetings
Agenda
Notes
Updates:
- Both HMS and SHMS DAQ are ready to take cosmic runs
- HMS cosmic looks good (FADC uses Hall D firmware)
- SHMS cosmic TDC and DC look good, but the replay root files don't have FADC events (Hall B firmware), could be the decoder is not set up correctly to decode Hall B firmware
- RHEL9 upgrade preparation is on-going
- Checked with Chris Cuevas: SOLID FADC will probably be available by end of November, and he should have enough SD boards for us now.