Difference between revisions of "Elong-15-03-26"

From HallCWiki
Jump to navigationJump to search
(New page: =11 GeV Beam= Based on discussions with Mark and Gerry, I redid the rates using a differently-binned 11 GeV bin to increase nu and <math>W_{NN}^2= 2q_0 m_D+m_D^2 -Q^2</math>, as there was...)
 
Line 9: Line 9:
 
Using the Bosted code, I calculated first preliminary estimates for t20.
 
Using the Bosted code, I calculated first preliminary estimates for t20.
  
[[Image:2015-03-26-t20.png]]
+
[[Image:2015-03-26-t20.png|600px]]

Revision as of 14:23, 26 March 2015

11 GeV Beam

Based on discussions with Mark and Gerry, I redid the rates using a differently-binned 11 GeV bin to increase nu and <math>W_{NN}^2= 2q_0 m_D+m_D^2 -Q^2</math>, as there was concern about the curves not being valid for low nu~0.5 GeV. W was replaced with W_NN, and the dotted line shows <math>W_{NN}=m_D+50</math> MeV.

2015-03-26-11gev.png

t20

Using the Bosted code, I calculated first preliminary estimates for t20.

2015-03-26-t20.png