=t20= | =t20= | ||
− | Using the Bosted code, I calculated first preliminary estimates for t20. | + | Using the Bosted code, I calculated first preliminary estimates for t20 using existing kinematics (although the 8.8 GeV kinematic was replaced with the above 11 GeV), utilizing 35 days of beam time. |
[[Image:2015-03-26-t20.png|600px]] | [[Image:2015-03-26-t20.png|600px]] |
Revision as of 10:53, 27 March 2015
11 GeV Beam
Based on discussions with Mark and Gerry, I redid the rates using a differently-binned 11 GeV bin to increase nu and <math>W_{NN}^2= 2q_0 m_D+m_D^2 -Q^2</math>, as there was concern about the curves not being valid for low nu~0.5 GeV. W was replaced with W_NN, and the dotted line shows <math>W_{NN}=m_D+50</math> MeV.
t20
Using the Bosted code, I calculated first preliminary estimates for t20 using existing kinematics (although the 8.8 GeV kinematic was replaced with the above 11 GeV), utilizing 35 days of beam time.