Based on discussions with Mark and Gerry, I redid the rates using a differently-binned 11 GeV bin to increase nu and <math>W_{NN}^2= 2q_0 m_D+m_D^2 -Q^2</math>, as there was concern about the curves not being valid for low nu~0.5 GeV. W was replaced with W_NN, and the dotted line shows <math>W_{NN}=m_D+50</math> MeV.
+
Based on discussions with Mark and Gerry, I redid the rates using a differently-binned 11 GeV bin to increase nu and <math>W_{NN}^2= 2\nu m_D+m_D^2 -Q^2</math>, as there was concern about the curves not being valid for low nu~0.5 GeV. W was replaced with W_NN, and the dotted line shows <math>W_{NN}=m_D+50</math> MeV.
  
 
[[Image:2015-03-26-11gev.png]]
 
[[Image:2015-03-26-11gev.png]]

Revision as of 11:51, 27 March 2015

11 GeV Beam

Based on discussions with Mark and Gerry, I redid the rates using a differently-binned 11 GeV bin to increase nu and <math>W_{NN}^2= 2\nu m_D+m_D^2 -Q^2</math>, as there was concern about the curves not being valid for low nu~0.5 GeV. W was replaced with W_NN, and the dotted line shows <math>W_{NN}=m_D+50</math> MeV.

2015-03-26-11gev.png

t20

Using the Bosted code, I calculated first preliminary estimates for t20 using existing kinematics (although the 8.8 GeV kinematic was replaced with the above 11 GeV), utilizing 35 days of beam time.

2015-03-26-t20.png