Difference between revisions of "Fall 2017 Commissioning Plan"

From HallCWiki
Jump to navigationJump to search
Line 11: Line 11:
 
| Final HMS and SHMS detector checkout plans. Defocused tune?
 
| Final HMS and SHMS detector checkout plans. Defocused tune?
 
|   
 
|   
 +
|
 +
|-
 +
| Checkout of quartz plane
 +
|  S Malace
 
|
 
|
 
|-
 
|-

Revision as of 14:56, 12 July 2017

Table of Commissioning Tasks

Task Person Comment
Harp scans and BPM checkout. Raster checkout.
Final HMS and SHMS detector checkout plans. Defocused tune?
Checkout of quartz plane S Malace
HMS and SHMS trigger efficiency with Hodo, Hodo+ Cerenkov.
HMS and SHMS DC checkout, software alignment and tracking efficiency
Beam energy
BCM Calibration D. Bhetuwal, D Mack
Target Boiling
Carbon elastic with sieve for final SHMS tune determination M Jones
Carbon elastic scan for delta matrix optimization H. Bhatt, D. Dutta
Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) M Jones
Sieve check after cycling SHMS magnets from positive to negative and back M Jones
A. Karki, S. Basnet, D. Dutta
Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check.
GEM Front Sieve to better understand HB. Do optics with p+ to check optics. L. Kabir, D. Dutta
Coincidence timing checkout and optimization.
Electronic deadtime checkout.
Single Kaon production. Coincidence p and K production.

Fall 2017 Commissioning Plan

  • The plan will be base on the plan of the full SHMS/HMS commissioning.