Difference between revisions of "Fall 2017 Commissioning Plan"
From HallCWiki
Jump to navigationJump to searchLine 5: | Line 5: | ||
| Comment | | Comment | ||
|- | |- | ||
− | | Harp scans and | + | | Harp scans, BPM and raster checkout |
− | | | + | | M. Jones |
| | | | ||
|- | |- | ||
Line 13: | Line 13: | ||
| | | | ||
|- | |- | ||
− | | | + | | SHMS quartz plane |
− | | | + | | S. Malace |
| | | | ||
|- | |- | ||
− | |HMS and SHMS trigger efficiency with Hodo, Hodo+ Cerenkov. | + | | HMS and SHMS trigger efficiency with Hodo, Hodo+ Cerenkov. |
| | | | ||
| | | | ||
Line 26: | Line 26: | ||
|- | |- | ||
| Beam energy | | Beam energy | ||
− | | | + | | M. Jones, D. Mack |
| | | | ||
|- | |- | ||
| BCM Calibration | | BCM Calibration | ||
− | | | + | | D. Mack, D. Bhetuwal |
| | | | ||
|- | |- | ||
| Target Boiling | | Target Boiling | ||
− | | | + | | D. Gaskell |
| | | | ||
|- | |- | ||
− | |Carbon elastic with sieve for final SHMS tune determination | + | | Carbon elastic with sieve for final SHMS tune determination |
− | | | + | | M. Jones, H. Szumila-Vance |
| | | | ||
|- | |- | ||
− | |Carbon elastic scan for delta matrix optimization | + | | Carbon elastic scan for delta matrix optimization |
− | | | + | | H. Bhatt, D. Dutta |
| | | | ||
|- | |- | ||
| Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) | | Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) | ||
− | | | + | | M. Jones, H. Szumila-Vance |
| | | | ||
|- | |- | ||
| Sieve check after cycling SHMS magnets from positive to negative and back | | Sieve check after cycling SHMS magnets from positive to negative and back | ||
− | | | + | | M. Jones |
| | | | ||
|- | |- | ||
Line 57: | Line 57: | ||
| | | | ||
|- | |- | ||
− | |Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check. | + | | Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check. |
− | | | + | | M. Jones, Temple student |
| | | | ||
|- | |- | ||
− | | GEM | + | | GEM front sieve to better understand HB. Do optics with p+ to check optics. |
| L. Kabir, D. Dutta | | L. Kabir, D. Dutta | ||
| | | | ||
|- | |- | ||
| Coincidence timing checkout and optimization. | | Coincidence timing checkout and optimization. | ||
− | | | + | | B. Sawatzky, E. Pooser, C. Yero |
| | | | ||
|- | |- | ||
− | | Electronic | + | | Electronic dead time checkout |
− | | | + | | B. Sawatzky, E. Pooser, C. Yero |
| | | | ||
|- | |- |
Revision as of 12:49, 11 October 2017
Table of Commissioning Tasks
Task | Person | Comment |
Harp scans, BPM and raster checkout | M. Jones | |
Final HMS and SHMS detector checkout plans. Defocused tune? | ||
SHMS quartz plane | S. Malace | |
HMS and SHMS trigger efficiency with Hodo, Hodo+ Cerenkov. | ||
HMS and SHMS DC checkout, software alignment and tracking efficiency | ||
Beam energy | M. Jones, D. Mack | |
BCM Calibration | D. Mack, D. Bhetuwal | |
Target Boiling | D. Gaskell | |
Carbon elastic with sieve for final SHMS tune determination | M. Jones, H. Szumila-Vance | |
Carbon elastic scan for delta matrix optimization | H. Bhatt, D. Dutta | |
Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) | M. Jones, H. Szumila-Vance | |
Sieve check after cycling SHMS magnets from positive to negative and back | M. Jones | |
Determine SHMS central momentum and angle with set of elastic ep data. | A. Karki, S. Basnet, D. Dutta | |
Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check. | M. Jones, Temple student | |
GEM front sieve to better understand HB. Do optics with p+ to check optics. | L. Kabir, D. Dutta | |
Coincidence timing checkout and optimization. | B. Sawatzky, E. Pooser, C. Yero | |
Electronic dead time checkout | B. Sawatzky, E. Pooser, C. Yero | |
Single Kaon production. Coincidence p and K production. |
Fall 2017 Commissioning Plan
- The plan will be base on the plan of the full SHMS/HMS commissioning.