Difference between revisions of "Fall 2017 Commissioning Plan"
From HallCWiki
Jump to navigationJump to searchm |
|||
Line 1: | Line 1: | ||
+ | = Fall 2017 Commissioning Plan = | ||
+ | * The plan will be base on the [[Commissioning_Plan_2017 | plan]] of the full SHMS/HMS commissioning. | ||
+ | * [https://github.com/MarkKJones/fall2017-plans Git repo] with run plans for the various tasks. To contribute a plan, fork the repo to your githu account. | ||
+ | |||
= Table of Commissioning Tasks = | = Table of Commissioning Tasks = | ||
{| border="1" cellpadding="2" valign="top" style="text-align: center;" | {| border="1" cellpadding="2" valign="top" style="text-align: center;" | ||
Line 93: | Line 97: | ||
| | | | ||
|} | |} | ||
− | |||
− | |||
− |
Revision as of 16:52, 6 November 2017
Fall 2017 Commissioning Plan
- The plan will be base on the plan of the full SHMS/HMS commissioning.
- Git repo with run plans for the various tasks. To contribute a plan, fork the repo to your githu account.
Table of Commissioning Tasks
Task | Person | Comment |
Harp Scans, BPM and Raster Checkout | M. Jones | |
HMS & SHMS Hodoscope Checkout | S. Malace | |
HMS & SHMS 3/4 Trigger & TOF Efficiency Checkout | S. Malace | |
SHMS Quartz Plane Checkout | S. Malace | |
HMS & SHMS DC Checkout, Tracking Efficiency and Alignment | H. Szumila-Vance, C. Yero | |
HMS & SHMS Heavy Gas Cherenkov Checkout | E. Pooser, R. Ambrose | |
HMS & SHMS Pre-Shower/Shower Checkout | H. Mkrtchyan, A. Asaturyan, V. Berdnikov | |
SHMS Aerogel Checkout | H. Mkrtchyan, A. Asaturyan, V. Berdnikov | |
HMS & SHMS Trigger Efficiency Checkout | B. Sawatzky, E. Pooser, C. Yero | |
Beam Energy | M. Jones, D. Mack | |
BCM Calibration | D. Mack, D. Bhetuwal | |
Target Boiling | D. Gaskell | |
Carbon Elastic with Sieve for Final SHMS Tune Determination | M. Jones, H. Szumila-Vance | |
Carbon Elastic Scan for Delta Matrix Optimization | H. Bhatt, D. Dutta | |
Carbon Inelastics with Sieve for Ytgt, Y’tgt and X’tgt (Need 20 deg for Ytgt) | M. Jones, H. Szumila-Vance | |
Sieve Check After Cycling SHMS Magnets from Positive to Negative and Back | M. Jones | |
Determine SHMS Central Momentum and Angle with Set of Elastic ep Data | A. Karki, S. Basnet, D. Dutta | Heepcheck Planning |
Inelastic Carbon Xn Measurements with Overlapping Momentum Settings for Acceptance Check | M. Jones, B. Duran | |
GEM Front Sieve to Better Understand HB. Do Optics with p+ to Check Optics | L. Kabir, D. Dutta | |
Coincidence Timing Checkout and Optimization | B. Sawatzky, E. Pooser, C. Yero | |
Electronic Dead Time Checkout | B. Sawatzky, E. Pooser, C. Yero | |
Single Kaon Production. Coincidence p and K Production |