Difference between revisions of "Temp overview"

From HallCWiki
Jump to navigationJump to search
 
Line 1: Line 1:
<html><body><pre>papersize=8.5in,11in&lt;br/&gt;
 
 
&lt;center&gt;CT Experiment (E12-06-107) Run Plan Overview&lt;br/&gt;
 
&lt;center&gt;CT Experiment (E12-06-107) Run Plan Overview&lt;br/&gt;
 
&lt;/center&gt;&lt;br/&gt;
 
&lt;/center&gt;&lt;br/&gt;
Line 129: Line 128:
 
#*{C 20.0 hrs, proton angle scan 2, 2500 cnts}&lt;br/&gt;
 
#*{C 20.0 hrs, proton angle scan 2, 2500 cnts}&lt;br/&gt;
 
}}&lt;br/&gt;
 
}}&lt;br/&gt;
 
\end{document}&lt;/math&gt;</pre></body></html>
 

Latest revision as of 15:21, 15 January 2018

<center>CT Experiment (E12-06-107) Run Plan Overview<br/> </center><br/> [htbp]

'''

Kinematics for the run.

<math>Q^2</math> <math>E_e</math> <math>\theta_{e'}^{HMS}</math> <math>p_{HMS}</math> <math>\theta_{SHMS}</math> <math>p_{SHMS}</math> notes
GeV<math>^2</math> GeV deg GeV/c deg GeV/c
8.01 6.4 45.07 2.131 17.13 5.122 overlap with E94139, first 3 pass kinematics, 1% stat
14.76 10.6 41.8 2.736 12.02 8.753 First 5 pass kinematics 2-2.5% stat
12.43 10.6 31.5 3.978 16.08 7.502 Second 5 pass kine, run with 2% stat
10.02 10.6 24.48 5.259 20.55 6.209 Third 5 pass kine, run with 1.4% stat
10.02 10.6 24.48 5.259 17.55 6.209 proton angle scan, &nbsp;2.5% stat (time permitting)
10.02 10.6 24.48 5.259 23.55 6.209 proton angle scan, &nbsp;2.5% stat (time permitting)

tab:kinematics_jul ''' <br/> All time estimates in the overview assume 50% Hall C + Accelerator efficiency, including configuration change time and a beam current of 65 <math>\mu</math>A. \<center><math>2ex]<br/> \subsection*{Last shift before Experiment begins:}<br/><br/>

  1. {All spectrometer magnets on to correct polarity and cycled to initial

values. Spectrometers also at initial angles.}<br/>

  1. {Check that no new obstructions have appeared since the spectrometer

angles were certified. For example, ladders, RadCon survey ropes, etc.}<br/>

  1. {Double-check HMS/SHMS Gas Cerenkov pressure is at correct value.}<br/>
  2. {Verify there are no obstructions between the detectors (ie, no WC covers,

no dangling cables, etc.) on both spectrometers.}<br/>

  1. {Verify there are no unusual obstructions between the scattering chamber

and the spectrometer front windows. Make sure any protective windows on the scattering chamber have been removed.}<br/>

  1. {Lock up the hall.}<br/>
  2. {Clean up the counting house. Make sure all terminals, consoles, and printers are alive and well.}<br/>
  3. {Take a cosmic run and look for problems.}<br/>

<br/> \pagebreak \noindent {\color{blue}{ \large '''{6.4 GeV data taking: 60 beam hours scheduled, need 8 hrs for calibration and 52 hrs (at 50% eff.) for production.}'''}}<br/><br/> {\BrickRed{

  1. {Calibrations </math><math> 8 hours}
    • {Verify magnets properly cycled - Beam energy measurement - Harp scan}
    • {Detector checkout with 3/4 trigger, and long run for detector calibration}
    • {BCM Calibration (unless one was completed very close to the start of experiment)}
    • {</math>ep<math> elastic coincidences, (Heepcheck) </math>Q^2<math>=4.0 GeV</math>^2<math>, HMS at 4.263 GeV/c, 22.10 deg, SHMS at 2.928 GeV/c, 33.21 deg ,expected rate ~ few Hz \@ 65 </math><math>A current. (at least 3 hrs).}
    • {verify timing of all triggers}}}<br/>
  2. {</math>Q^2=8.0<math> </math>(GeV/c)^2<math> production, goal: 10000 cnts}
    • {LH + MT 12 hrs + 4 hrs}
    • {C 36 hrs}<br/>

\noindent {\color{blue}{ \large '''{10.6 GeV data taking: 300 beam hours scheduled, need 8 hrs for calibration and 292 hrs (at 50% eff.) for production.}'''}}<br/>{\BrickRed{

  1. {Calibrations </math><math> 8 hours}
    • {Verify magnets properly cycled - Beam energy measurement - Harp scan}
    • {Detector checkout with 3/4 trigger, and long run for detector calibration}
    • {BCM calibration}
    • {</math>ep<math> elastic coincidences (Heepcheck), </math>Q^2<math>=9.5 GeV</math>^2<math>, HMS at 5.5394 GeV/c, 23.20 deg, SHMS at 5.9250 GeV/c, 21.61 deg ,expected rate ~ few Hz \@ 65 </math><math>A current. (at least 4 hrs) }}}<br/>

{\PineGreen{<br/>

  1. {</math>Q^2=14.76<math> </math>(GeV/c)^2<math> production, goal: 2000 cnts}
    • {LH + MT 51 hrs + 17 hrs}
    • {C 122 hrs}
  2. {configuration change 5 hrs}
  3. {</math>Q^2=12.43<math> </math>(GeV/c)^2<math> production, goal: 2500 cnts}
    • {LH + MT 12 hrs + 4 hrs}
    • {C 24 hrs}
  4. {configuration change 5 hrs}
  5. {</math>Q^2=10.02<math> </math>(GeV/c)^2<math> production, goal: 4500 cnts}
    • {LH + MT 6 hrs + 2 hrs}
    • {C 12.0 hrs}
  6. {</math>Q^2=10.02<math> </math>(GeV/c)^2<math> proton angle scan, goal: 2500 cnts }
    • {C 12.0 hrs, proton angle scan 1, 2500 cnts}
    • {C 20.0 hrs, proton angle scan 2, 2500 cnts}<br/>

}}<br/>