<center>CT Experiment (E12-06-107) Run Plan Overview<br/> | <center>CT Experiment (E12-06-107) Run Plan Overview<br/> | ||
</center><br/> | </center><br/> | ||
Line 129: | Line 128: | ||
#*{C 20.0 hrs, proton angle scan 2, 2500 cnts}<br/> | #*{C 20.0 hrs, proton angle scan 2, 2500 cnts}<br/> | ||
}}<br/> | }}<br/> | ||
− | |||
− |
Latest revision as of 15:21, 15 January 2018
<center>CT Experiment (E12-06-107) Run Plan Overview<br/> </center><br/> [htbp]
'''
Kinematics for the run.
<math>Q^2</math> | <math>E_e</math> | <math>\theta_{e'}^{HMS}</math> | <math>p_{HMS}</math> | <math>\theta_{SHMS}</math> | <math>p_{SHMS}</math> | notes |
GeV<math>^2</math> | GeV | deg | GeV/c | deg | GeV/c | |
8.01 | 6.4 | 45.07 | 2.131 | 17.13 | 5.122 | overlap with E94139, first 3 pass kinematics, 1% stat |
14.76 | 10.6 | 41.8 | 2.736 | 12.02 | 8.753 | First 5 pass kinematics 2-2.5% stat |
12.43 | 10.6 | 31.5 | 3.978 | 16.08 | 7.502 | Second 5 pass kine, run with 2% stat |
10.02 | 10.6 | 24.48 | 5.259 | 20.55 | 6.209 | Third 5 pass kine, run with 1.4% stat |
10.02 | 10.6 | 24.48 | 5.259 | 17.55 | 6.209 | proton angle scan, 2.5% stat (time permitting) |
10.02 | 10.6 | 24.48 | 5.259 | 23.55 | 6.209 | proton angle scan, 2.5% stat (time permitting) |
tab:kinematics_jul ''' <br/> All time estimates in the overview assume 50% Hall C + Accelerator efficiency, including configuration change time and a beam current of 65 <math>\mu</math>A. \<center><math>2ex]<br/> \subsection*{Last shift before Experiment begins:}<br/><br/>
- {All spectrometer magnets on to correct polarity and cycled to initial
values. Spectrometers also at initial angles.}<br/>
- {Check that no new obstructions have appeared since the spectrometer
angles were certified. For example, ladders, RadCon survey ropes, etc.}<br/>
- {Double-check HMS/SHMS Gas Cerenkov pressure is at correct value.}<br/>
- {Verify there are no obstructions between the detectors (ie, no WC covers,
no dangling cables, etc.) on both spectrometers.}<br/>
- {Verify there are no unusual obstructions between the scattering chamber
and the spectrometer front windows. Make sure any protective windows on the scattering chamber have been removed.}<br/>
- {Lock up the hall.}<br/>
- {Clean up the counting house. Make sure all terminals, consoles, and printers are alive and well.}<br/>
- {Take a cosmic run and look for problems.}<br/>
<br/> \pagebreak \noindent {\color{blue}{ \large '''{6.4 GeV data taking: 60 beam hours scheduled, need 8 hrs for calibration and 52 hrs (at 50% eff.) for production.}'''}}<br/><br/> {\BrickRed{
- {Calibrations </math><math> 8 hours}
- {Verify magnets properly cycled - Beam energy measurement - Harp scan}
- {Detector checkout with 3/4 trigger, and long run for detector calibration}
- {BCM Calibration (unless one was completed very close to the start of experiment)}
- {</math>ep<math> elastic coincidences, (Heepcheck) </math>Q^2<math>=4.0 GeV</math>^2<math>, HMS at 4.263 GeV/c, 22.10 deg, SHMS at 2.928 GeV/c, 33.21 deg ,expected rate ~ few Hz \@ 65 </math><math>A current. (at least 3 hrs).}
- {verify timing of all triggers}}}<br/>
- {</math>Q^2=8.0<math> </math>(GeV/c)^2<math> production, goal: 10000 cnts}
- {LH + MT 12 hrs + 4 hrs}
- {C 36 hrs}<br/>
\noindent {\color{blue}{ \large '''{10.6 GeV data taking: 300 beam hours scheduled, need 8 hrs for calibration and 292 hrs (at 50% eff.) for production.}'''}}<br/>{\BrickRed{
- {Calibrations </math><math> 8 hours}
- {Verify magnets properly cycled - Beam energy measurement - Harp scan}
- {Detector checkout with 3/4 trigger, and long run for detector calibration}
- {BCM calibration}
- {</math>ep<math> elastic coincidences (Heepcheck), </math>Q^2<math>=9.5 GeV</math>^2<math>, HMS at 5.5394 GeV/c, 23.20 deg, SHMS at 5.9250 GeV/c, 21.61 deg ,expected rate ~ few Hz \@ 65 </math><math>A current. (at least 4 hrs) }}}<br/>
{\PineGreen{<br/>
- {</math>Q^2=14.76<math> </math>(GeV/c)^2<math> production, goal: 2000 cnts}
- {LH + MT 51 hrs + 17 hrs}
- {C 122 hrs}
- {configuration change 5 hrs}
- {</math>Q^2=12.43<math> </math>(GeV/c)^2<math> production, goal: 2500 cnts}
- {LH + MT 12 hrs + 4 hrs}
- {C 24 hrs}
- {configuration change 5 hrs}
- {</math>Q^2=10.02<math> </math>(GeV/c)^2<math> production, goal: 4500 cnts}
- {LH + MT 6 hrs + 2 hrs}
- {C 12.0 hrs}
- {</math>Q^2=10.02<math> </math>(GeV/c)^2<math> proton angle scan, goal: 2500 cnts }
- {C 12.0 hrs, proton angle scan 1, 2500 cnts}
- {C 20.0 hrs, proton angle scan 2, 2500 cnts}<br/>
}}<br/>