Difference between revisions of "A1nd2n-ERR"

From HallCWiki
Jump to navigationJump to search
Line 25: Line 25:
 
| '''8:30''' || Closed Session
 
| '''8:30''' || Closed Session
 
|-
 
|-
| '''9:00''' || [[File:TBD|A1n overview and running conditions]] (1, 2a)  ||  Xiaochao Zheng || 10+5
+
| '''9:00''' || [[File:a1n_overview-Zheng.pdf|A1n overview and running conditions]] (1, 2a)  ||  Xiaochao Zheng || 10+5
 
|-
 
|-
| '''9:15''' || [[File:TBD|d2n overview and running conditions]] (1, 2a)  ||  Brad Sawatzky || 10+5
+
| '''9:15''' || [[File:d2n_overview-Sawatzky.pdf|d2n overview and running conditions]] (1, 2a)  ||  Brad Sawatzky || 10+5
 
|-
 
|-
| '''9:30''' || [[File:TBD|Polarized 3He target]] (2a, 2b, 3)  ||  Jianping Chen || 30+10
+
| '''9:30''' || [[File:Target_overvew-Chen.pdf|Polarized 3He target]] (2a, 2b, 3)  ||  Jianping Chen || 30+10
 
|-
 
|-
|'''10:10''' || [[File:TBD|Magnetic field calculations and compensation coils]] (3)  ||  Steve Lassiter (?)/Gordon Cates || 10+5
+
|'''10:10''' || [[File:Target_fields.pdf|Magnetic field calculations and compensation coils]] (3)  ||  Steve Lassiter (?)/Gordon Cates || 10+5
 
|-
 
|-
|'''10:35''' || [[File:TBD|Beamline, Moller polarimetry]] (4, 2c)  ||  Dave Gaskell || 15+10  
+
|'''10:35''' || [[File:Moller_overview-Gaskell.pdf|Beamline, Moller polarimetry]] (4, 2c)  ||  Dave Gaskell || 15+10  
 
|-  
 
|-  
 
|'''11:00''' || colspan="3"|Coffee Break
 
|'''11:00''' || colspan="3"|Coffee Break
 
|-
 
|-
|'''11:20''' || [[File:TBD|Installation]] (5)  ||  Walter Kellner || 15+10
+
|'''11:20''' || [[File:Installation_overview-Kellner.pdf|Installation]] (5)  ||  Walter Kellner || 15+10
 
|-
 
|-
|'''11:45''' || [[File:TBD|Spectrometer and detector system]] (4)  ||  Brad Sawatzky || 10+5
+
|'''11:45''' || [[File:Detector_overview-Sawatzky.pdf|Spectrometer and detector system]] (4)  ||  Brad Sawatzky || 10+5
 
|-
 
|-
|'''12:00''' || [[File:TBD|Beam commissioning and machine protection]] (6)  ||  Jay Benesch || 10+5
+
|'''12:00''' || [[File:Beam_and_Machine_overview-Benesch.pdf|Beam commissioning and machine protection]] (6)  ||  Jay Benesch || 10+5
 
|-
 
|-
|'''12:15''' || [[File:TBD| Radiation levels outside and in the hall, and shielding]] (7)  || Jixie Zhang || 10+5
+
|'''12:15''' || [[File:Radiation_overview-Zhang.pdf| Radiation levels outside and in the hall, and shielding]] (7)  || Jixie Zhang || 10+5
 
|-
 
|-
|'''12:30''' || [[File:TBD|A1n timeline, manpower, analysis and publication plan, documentation and summary]] (1,5,8,9)  ||  Xiaochao Zheng || 10+5
+
|'''12:30''' || [[File:A1n_analysis_plan-Zheng.pdf|A1n timeline, manpower, analysis and publication plan, documentation and summary]] (1,5,8,9)  ||  Xiaochao Zheng || 10+5
 
|-
 
|-
|'''12:45''' || [[File:TBD|d2n timeline, manpower, analysis and publication plan, documentation and summary]] (1,5,8)  ||  Brad Sawatzky || 10+5
+
|'''12:45''' || [[File:d2n_analysis_plan-Sawatzky.pdf|d2n timeline, manpower, analysis and publication plan, documentation and summary]] (1,5,8)  ||  Brad Sawatzky || 10+5
 
|-
 
|-
 
|-
 
|-

Revision as of 17:19, 6 March 2018

ERR Committee Members

  • Pavel Degtiarenko
  • Alexandre Deur
  • Chris Keith (chair)
  • Renuka Rajput-Ghoshal
  • Bert Manzlak
  • Michael Tiefenback
  • Javier Gomez (observer)
  • Ed Folts (observer)

Charge

Preliminary Agenda

Monday March 19, 2018

Room: Cebaf Center L102

Time Agenda Item (Charge item addressed) Speaker Duration
8:30 Closed Session
9:00 File:A1n overview-Zheng.pdf (1, 2a) Xiaochao Zheng 10+5
9:15 d2n overview and running conditions (1, 2a) Brad Sawatzky 10+5
9:30 Polarized 3He target (2a, 2b, 3) Jianping Chen 30+10
10:10 Magnetic field calculations and compensation coils (3) Steve Lassiter (?)/Gordon Cates 10+5
10:35 Beamline, Moller polarimetry (4, 2c) Dave Gaskell 15+10
11:00 Coffee Break
11:20 Installation (5) Walter Kellner 15+10
11:45 File:Detector overview-Sawatzky.pdf (4) Brad Sawatzky 10+5
12:00 Beam commissioning and machine protection (6) Jay Benesch 10+5
12:15 File:Radiation overview-Zhang.pdf (7) Jixie Zhang 10+5
12:30 A1n timeline, manpower, analysis and publication plan, documentation and summary (1,5,8,9) Xiaochao Zheng 10+5
12:45 d2n timeline, manpower, analysis and publication plan, documentation and summary (1,5,8) Brad Sawatzky 10+5
13:00 Lunch and executive session
16:00 Close-out

Polarized He-3 Proposals

E12-06-110 (A1n)

Measurement of the neutron spin asymmetry A1n in the valence quark region using a 11 GeV beam and a polarized 3He target in Hall C

  • E12-06-110 (A1n) proposal for PAC30 - detailed physics motivation and rates/uncertainties assuming the 6 GeV polarized 3He target performance
  • E12-06-110 (A1n) Update for PAC36 - in this update we used the stage-II target upgrade performance - approved for 36 PAC days
  • E12-06-110 (A1n) 2018 Update - in this update we summarize the rate and uncertainty estimation using the stage-I polarized 3He target and with the latest HMS and SHMS simulations, while keeping the total approved beam time (36 PAC days) unchanged. Some of the kinematic settings have been modified to reflect the latest status of the HMS or SHMS.

E12-06-121 (d2n-g2n)

E12-06-121A (Measurement of 3He Elastic Electromagnetic Form Factor Diffractive Minima Using Polarization Observables)

Additional Documentation

Polarized He3 Target

OSPs

General Hall C Documentation