Difference between revisions of "A1nd2n-ERR"

From HallCWiki
Jump to navigationJump to search
Line 17: Line 17:
 
'''Room:  Cebaf Center L102'''
 
'''Room:  Cebaf Center L102'''
  
 +
[http://www.example.com link title]
 
  NOTICE: Apparently the wiki's file handling is broken at the moment.  I'll talk to IT first thing Wednesday...
 
  NOTICE: Apparently the wiki's file handling is broken at the moment.  I'll talk to IT first thing Wednesday...
  
Line 33: Line 34:
 
| '''8:30''' || Closed Session
 
| '''8:30''' || Closed Session
 
|-
 
|-
| '''9:00''' || [[Media:a1n_overview-Zheng|A1n overview and running conditions]] (1, 2a)  ||  Xiaochao Zheng || 10+5
+
| '''9:00''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/myfile.pdf A1n overview and running conditions] (1, 2a)  ||  Xiaochao Zheng || 10+5
 
|-
 
|-
| '''9:15''' || [[Media:d2n_overview-Sawatzky|d2n overview and running conditions]] (1, 2a)  ||  Brad Sawatzky || 10+5
+
| '''9:15''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/myfile.pdf d2n overview and running conditions] (1, 2a)  ||  Brad Sawatzky || 10+5
 
|-
 
|-
| '''9:30''' || [[Media:Target_overvew-Chen|Polarized 3He target]] (2a, 2b, 3)  ||  Jianping Chen || 30+10
+
| '''9:30''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/myfile.pdf Polarized 3He target] (2a, 2b, 3)  ||  Jianping Chen || 30+10
 
|-
 
|-
|'''10:10''' || [[Media:Target_fields|Magnetic field calculations and compensation coils]] (3)  ||  Steve Lassiter (?)/Gordon Cates || 10+5
+
|'''10:10''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/myfile.pdf Magnetic field calculations and compensation coils] (3)  ||  Steve Lassiter (?)/Gordon Cates || 10+5
 
|-
 
|-
|'''10:35''' || [[Media:Moller_overview-Gaskell|Beamline, Moller polarimetry]] (4, 2c)  ||  Dave Gaskell || 15+10  
+
|'''10:35''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/a1n_d2n_beamline_moller-ERR_v3.pdf Beamline, Moller polarimetry] (4, 2c)  ||  Dave Gaskell || 15+10  
 
|-  
 
|-  
 
|'''11:00''' || colspan="3"|Coffee Break
 
|'''11:00''' || colspan="3"|Coffee Break
 
|-
 
|-
|'''11:20''' || [[Media:Installation_overview-Kellner|Installation]] (5)  ||  Walter Kellner || 15+10
+
|'''11:20''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/myfile.pdf  Installation] (5)  ||  Walter Kellner || 15+10
 
|-
 
|-
|'''11:45''' || [[Media:Detector_overview-Sawatzky|Spectrometer and detector system]] (4)  ||  Brad Sawatzky || 10+5
+
|'''11:45''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/detector-systems_sawatzky_v1.pdf Spectrometer and detector system] (4)  ||  Brad Sawatzky || 10+5
 
|-
 
|-
|'''12:00''' || [[Media:Beam_and_Machine_overview-Benesch|Beam commissioning and machine protection]] (6)  ||  Jay Benesch || 10+5
+
|'''12:00''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/myfile.pdf Beam commissioning and machine protection] (6)  ||  Jay Benesch || 10+5
 
|-
 
|-
|'''12:15''' || [[Media:Radiation_overview-Zhang| Radiation levels outside and in the hall, and shielding]] (7)  || Jixie Zhang || 10+5
+
|'''12:15''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Jixie_A1ND2N_ERR_Radiation_201803.pdf Radiation levels outside and in the hall, and shielding] (7)  || Jixie Zhang || 10+5
 
|-
 
|-
|'''12:30''' || [[Media:A1n_analysis_plan-Zheng|A1n timeline, manpower, analysis and publication plan, documentation and summary]] (1,5,8,9)  ||  Xiaochao Zheng || 10+5
+
|'''12:30''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/ A1nERR_Zheng_talk2.pdf A1n timeline, manpower, analysis and publication plan, documentation and summary] (1,5,8,9)  ||  Xiaochao Zheng || 10+5
 
|-
 
|-
|'''12:45''' || [[Media:d2n_analysis_plan-Sawatzky|d2n timeline, manpower, analysis and publication plan, documentation and summary]] (1,5,8)  ||  Brad Sawatzky || 10+5
+
|'''12:45''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/myfile.pdf d2n timeline, manpower, analysis and publication plan, documentation and summary] (1,5,8)  ||  Brad Sawatzky || 10+5
 
|-
 
|-
 
|-
 
|-

Revision as of 15:19, 7 March 2018

ERR Committee Members

  • Pavel Degtiarenko
  • Alexandre Deur
  • Chris Keith (chair)
  • Renuka Rajput-Ghoshal
  • Bert Manzlak
  • Michael Tiefenback
  • Javier Gomez (observer)
  • Ed Folts (observer)

Charge

Preliminary Agenda

Monday March 19, 2018

Room: Cebaf Center L102

link title

NOTICE: Apparently the wiki's file handling is broken at the moment.  I'll talk to IT first thing Wednesday...
Presenters:  You can post your talk by clicking on 'your' link in the agenda.  You will be prompted to log into the wiki (CUE user/pass)
  if you have not already done so.  You can then upload your presentation.
If you wish to upload a new version of your talk, then you can find your file via this link Special:ListFiles
  (search on your name), and click on the 'Upload new version' button.  Email your talk to Brad S if you have any problems.   
Time Agenda Item (Charge item addressed) Speaker Duration
8:30 Closed Session
9:00 A1n overview and running conditions (1, 2a) Xiaochao Zheng 10+5
9:15 d2n overview and running conditions (1, 2a) Brad Sawatzky 10+5
9:30 Polarized 3He target (2a, 2b, 3) Jianping Chen 30+10
10:10 Magnetic field calculations and compensation coils (3) Steve Lassiter (?)/Gordon Cates 10+5
10:35 Beamline, Moller polarimetry (4, 2c) Dave Gaskell 15+10
11:00 Coffee Break
11:20 Installation (5) Walter Kellner 15+10
11:45 Spectrometer and detector system (4) Brad Sawatzky 10+5
12:00 Beam commissioning and machine protection (6) Jay Benesch 10+5
12:15 Radiation levels outside and in the hall, and shielding (7) Jixie Zhang 10+5
12:30 A1nERR_Zheng_talk2.pdf A1n timeline, manpower, analysis and publication plan, documentation and summary (1,5,8,9) Xiaochao Zheng 10+5
12:45 d2n timeline, manpower, analysis and publication plan, documentation and summary (1,5,8) Brad Sawatzky 10+5
13:00 Lunch and executive session
16:00 Close-out

Polarized He-3 Proposals

E12-06-110 (A1n)

Measurement of the neutron spin asymmetry A1n in the valence quark region using a 11 GeV beam and a polarized 3He target in Hall C

  • E12-06-110 (A1n) proposal for PAC30 - detailed physics motivation and rates/uncertainties assuming the 6 GeV polarized 3He target performance
  • E12-06-110 (A1n) Update for PAC36 - in this update we used the stage-II target upgrade performance - approved for 36 PAC days
  • E12-06-110 (A1n) 2018 Update - in this update we summarize the rate and uncertainty estimation using the stage-I polarized 3He target and with the latest HMS and SHMS simulations, while keeping the total approved beam time (36 PAC days) unchanged. Some of the kinematic settings have been modified to reflect the latest status of the HMS or SHMS.

E12-06-121 (d2n-g2n)

E12-06-121A (Measurement of 3He Elastic Electromagnetic Form Factor Diffractive Minima Using Polarization Observables)

Additional Documentation

Polarized He3 Target

COO, ESAD and OSPs

General Hall C Documentation