Difference between revisions of "A1nd2n-ERR"
From HallCWiki
Jump to navigationJump to searchLine 71: | Line 71: | ||
= Additional Documentation = | = Additional Documentation = | ||
== Polarized He3 Target == | == Polarized He3 Target == | ||
+ | [https://hallcweb.jlab.org/experiments/A1n/safety_docs/PolHe3_OSP_v1.pdf Polarized 3He OSP] | ||
+ | |||
== COO, ESAD and OSPs == | == COO, ESAD and OSPs == | ||
Revision as of 14:36, 13 March 2018
ERR Committee Members
- Pavel Degtiarenko
- Alexandre Deur
- Chris Keith (chair)
- Renuka Rajput-Ghoshal
- Bert Manzlak
- Michael Tiefenback
- Javier Gomez (observer)
- Ed Folts (observer)
Charge
Preliminary Agenda
Monday March 19, 2018
Room: Cebaf Center L102
NOTICE: The wiki's file handling is broken at the moment (CCPR has been entered), so we'll have to do this in a few steps.
Presenters: You will need to copy your talk to this directory: /group/hallc/www/hallcweb/html/experiments/A1n/meetings/ERR_Talks/ And then update the link in the agenda below by logging into the wiki, clicking the 'Edit' link next to 'Preliminary Agenda' and replacing the 'TBD.pdf' file name associated with your talk below to the filename you used. Email your talk to Brad S or Xiaochao Z. if you have any problems.
Polarized He-3 Proposals
E12-06-110 (A1n)
Measurement of the neutron spin asymmetry A1n in the valence quark region using a 11 GeV beam and a polarized 3He target in Hall C
- E12-06-110 (A1n) proposal for PAC30 - detailed physics motivation and rates/uncertainties assuming the 6 GeV polarized 3He target performance
- E12-06-110 (A1n) Update for PAC36 - in this update we used the stage-II target upgrade performance - approved for 36 PAC days
- E12-06-110 (A1n) 2018 Update - in this update we summarize the rate and uncertainty estimation using the stage-I polarized 3He target and with the latest HMS and SHMS simulations, while keeping the total approved beam time (36 PAC days) unchanged. Some of the kinematic settings have been modified to reflect the latest status of the HMS or SHMS.
E12-06-121 (d2n-g2n)
- E12-06-121 (d2n-g2n) Proposal for PAC30
- E12-06-121 (d2n-g2n) Update for PAC36 (Grading PAC) - Approved for 29 PAC days. Updated to accommodate planned improvement in Target FoM.
E12-06-121A (Measurement of 3He Elastic Electromagnetic Form Factor Diffractive Minima Using Polarization Observables)
- Pol_3He_Elastic_Measurement
- 3He Form Factor Double-Polarization Asymmetry Measurement Proposal
Additional Documentation
Polarized He3 Target
COO, ESAD and OSPs
- COO draft
- ESAD draft
- Moller-related drafts: Moller Operation Manual Moller OSP Hall C ODH Analysis with Moller Task Hazard Analysis
- Polarized 3He Target OSP (to be posted)