Difference between revisions of "KAON-LT specific intructions"

From HallCWiki
Jump to navigationJump to search
(Created page with "'''Rates:''' • Single particle and coincidence rates have been estimated for all runs. Watch the scintillator rates (S1 and 3/4 planes) for each spectrometer for an indicati...")
 
Line 1: Line 1:
 
'''Rates:'''
 
'''Rates:'''
Single particle and coincidence rates have been estimated for all runs. Watch the scintillator
+
* Single particle and coincidence rates have been estimated for all runs. Watch the scintillator
 
rates (S1 and 3/4 planes) for each spectrometer for an indication of the particle rate through
 
rates (S1 and 3/4 planes) for each spectrometer for an indication of the particle rate through
 
the wire chambers, and if actual rate is substantially (> 50%) higher than what is listed in
 
the wire chambers, and if actual rate is substantially (> 50%) higher than what is listed in
 
the run plan, the RC should be warned.
 
the run plan, the RC should be warned.
We want to keep the particle rate in each spectrometer below 650 kHz, and for some low
+
* We want to keep the particle rate in each spectrometer below 650 kHz, and for some low
 
energy runs this will require the beam current to be reduced from the nominal 70 μA value.
 
energy runs this will require the beam current to be reduced from the nominal 70 μA value.
For some low rate runs, it may be possible to use up to 100 μA beam with particle rates still
+
* For some low rate runs, it may be possible to use up to 100 μA beam with particle rates still
 
below 350 kHz. Consult with the RC before requesting a higher beam current.
 
below 350 kHz. Consult with the RC before requesting a higher beam current.
The prescaler values in the run plan are a guide. Adjust them to keep the singles data rate
+
* The prescaler values in the run plan are a guide. Adjust them to keep the singles data rate
 
in each spectrometer between ∼100-150 Hz.
 
in each spectrometer between ∼100-150 Hz.
All run times assume 100% running efficiency. Adjust the time for actual delivered beam
+
* All run times assume 100% running efficiency. Adjust the time for actual delivered beam
 
time, and let the RC know if the efficiency drops below 60% for an extended period.
 
time, and let the RC know if the efficiency drops below 60% for an extended period.

Revision as of 11:38, 22 August 2018

Rates:

  • Single particle and coincidence rates have been estimated for all runs. Watch the scintillator

rates (S1 and 3/4 planes) for each spectrometer for an indication of the particle rate through the wire chambers, and if actual rate is substantially (> 50%) higher than what is listed in the run plan, the RC should be warned.

  • We want to keep the particle rate in each spectrometer below 650 kHz, and for some low

energy runs this will require the beam current to be reduced from the nominal 70 μA value.

  • For some low rate runs, it may be possible to use up to 100 μA beam with particle rates still

below 350 kHz. Consult with the RC before requesting a higher beam current.

  • The prescaler values in the run plan are a guide. Adjust them to keep the singles data rate

in each spectrometer between ∼100-150 Hz.

  • All run times assume 100% running efficiency. Adjust the time for actual delivered beam

time, and let the RC know if the efficiency drops below 60% for an extended period.