RC meeting and Run Plan, Friday Nov 2

From HallCWiki
Revision as of 16:47, 2 November 2018 by Randallm (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Status

  • Finishing up Kin Group 14
  • Kin Group 17 comes next
  • Plan to coordinate with Hall D for low-current running during their proposed TAC run on Wednesday

Time-Ordered Run Plan

  • Kin14.20 currently running
  • Kin14.21 ...
  • Kin17.6 SHMS stepping down in angle...
  • Kin17.5 ...
  • Kin17.4 ...

SHMS POLARITY CHANGE

  • Kin17.3
  • Kin18.5 SHMS stepping up in angle...
  • Kin18.6 ...
  • Kin18.7 ...
  • Kin18.8 ...

SHMS POLARITY CHANGE

  • Kin18.1 SHMS stepping down in angle...
  • Kin18.2 ...
  • Kin18.3 ...
  • Kin18.4 ...
  • Kin14.5

SHMS POLARITY CHANGE (all else same)

  • Kin13.5

Reminders

  • Take one HMS monitoring run each shift
  • For all settings, for each target, split the desired charge between three runs
  • Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.

Issues

  • Shift workers needed in the next week (Shift Signup)
    • Day TO Sat/Sun
    • Owl shifts all next week!

Planned access to the hall

  • No Planned Accesses