Management/software
From HallCWiki
Jump to navigationJump to search
12 GeV software review
- Email from Rolf on the dry runs
First dry runs for the software review talks are scheduled for Monday May 14th from 1 pm to 5 pm in F326/7. As float we have the next day, Tuesday from 3:30 pm on, at the same location. The main idea of these dry runs is to have presentations near-complete such that we can bounce ideas off each other, find omissions, make improvements. There do not have to be stand-uop presentations, mainly flipping through the various slides.
- Charge of the committee.
- Agenda of meeting on June 7 and 8th.
- Current working drafts of morning and afternoon talks and backup material for June 2012 software review.
- [Morning Session] (May 3, 2012: Added a copy of the charge for reference.)
- [Afternoon Session] (May 10, 2012) Latest version from GN, includes SIMC material from JRA.
- [DAQ Summary] (May 10, 2012) from Brad Sawatzky, a better overview with timeline is coming.
- [SIMC overview - Possible backup material]
- All hall [Documents ] for planning for a JLab softwrae readiness review