Run plan for VCS

From HallCWiki
Revision as of 22:04, 19 June 2019 by Atac (Talk | contribs)

Jump to: navigation, search

E12-15-005 VCS experiment run plan is summarized in the table below:

HMS SHMS TARGET I (uA) RASTER DURATION Q (C) TRIGGER DAQ STATUS
P(MeV) THETA(Deg) P(MeV) THETA(Deg)
Kin IIIb 794.68 60.74 4034.44 7.68791
KinIIIa LH2
KinIa LH2
KinIb
KinIIb LH2
KinIIa
Kin Va
Kin Vb