5-pass production for A1n
From HallCWiki
Overview
For polarized 3He running in Fall 2019 and Spring 2020, the nominal raster for production is 5mm diameter circular. The nominal triggers used are 3/4 for both HMS and SHMS. Both HMS and SHMS should be taking data (for example if run plan specify one run, it means one run on HMS and one run on SHMS simultaneously). No coincidence trigger will be used/setup.
For 5-pass production of A1n, we will do the high x setting (large angle) first, then rotate the target. After target rotation we will take low/medium x data for A1n, followed by the d2n experiment.
Polarized_Helium-3_Experiments#Run_Plan <- click this to return to main run plan page
Beam and raster checkout
Please refer to Beam and Raster Checkout for A1n/d2n (Short Procedure).
Moller Measurement
- Will need 8 hours to setup Moller and 8 hours to perform one Moller measurement. - Plan: we will perform one Moller measurement every (two?) week or after each beam condition change.
Beam Energy Measurement
- RC should contact MCC to organize a beam energy measurement during 1-pass running. - Time: 1 hour - Plan: we will perform one beam energy measurement before X'mas shutdown and one after, or as needed by each beam down period or condition change.
Production Running
Online/Expert Analysis Requirement
Things to Watch For in Online Analysis - Check PID, we need only electrons. Pion backgrounds may be high. - Check ytar or ztar distribution to check if cuts are necessary to reject glass windows. Electron yield should be extracted for 3He gas only. - Asymmetry will flip sign for each target spin and beam IHWP reversal. - Please extract yield per charge, helicity-dependent yield N+ N- cumulated over this kinematics. - Please use xbj bins, extract N+ N- cumulated over this kinematics, and calculate asymmetries. - xbj bin centers: 0.25, 0.30, 0.35, 0.40, 0.45, 0.50, 0.55, 0.60, 0.65, 0.71,0.77,0.83,0.89,0.95,1.00 - xbj bin widths: 0.025,0.025,0.025,0.025,0.025,0.025,0.025,0.025,0.025,0.03,0.03,0.03,0.03,0.03,0.03 - Please post W and Xbj distributions, cumulated N+ N-, x-binned cumulated N+ N-, x-binned cumulated asymmetries per day.
Polarized 3He Target Polarimetry Measurements
- during typically data taking, need full target polarimetry (EPR, NMR, pNMR) once per shift, and pNMR (pulsed NMR) every 2 hours.
Production Large Angle (30-degree) High Momentum Running (Kine 4,B)
Overview - We will run 42.5 (40 now?) calendar days with SHMS Kine B/HMS Kine 4; - For this setting, 82% of data will be taken with longitudinal target spin, 18% at transverse target spin; - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations; - We will take 1 hour of Empty Cell runs. More may be needed. - We will take 4 hours of Reference Cell N2 runs at 8 atm; - We will take 4 hours of data with SHMS at positive polarity (should be combined with positive polarity kine C below);
Setup - Beam Current: 30uA, raster always ON (5mm diameter) - Target: Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He - HMS (Kine 4): 30.0 deg, 3.5 GeV/c (electron) - SHMS (Kine B): 30.0 deg, 3.4 GeV/c (electron) except for positive polarity running - Detectors: All SC bars ON
Procedure - Need to fill in frequency of target polarimetry measurements, nominal time for each run, frequency to flip beam IHWP and target spin directions (ideally we want to have all 4 combinations for each 24 hours of beam).
- Expected 3He gas rate: 0.94 Hz (HMS), 1.57 Hz (SHMS); - Expected pi/e ratio: (2-5):1 for the worst xbj bin - Expected total electron counts (3He gas yield N+ plus N-): 1.7M (HMS), 2.9M(SHMS)
Production Large Angle (30-degree) Low Momentum Running (Kine 3,C)
Overview - We will run 7.3 (6 now?) days at SHMS Kine C/HMS Kine 3; - For this setting, 82% of data will be taken with longitudinal target spin, 18% at transverse target spin; - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations; - We will take 1 hour of Empty Cell runs. More may be needed. - We will take 4 hours of Reference Cell N2 runs at 8 atm; - We will take 4 hours of data with SHMS at positive polarity (should be combined with positive polarity kine B above);
Setup - Beam Current: 30uA, raster always ON (5mm diameter) - Target: Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He - HMS (Kine 3): 30.0 deg, 2.9 GeV/c (electron) - SHMS (Kine C): 30.0 deg, 2.4 GeV/c (electron) except for positive polarity running - Detectors: All SC bars ON
Procedure
- Expected 3He gas rate: 3.4Hz (HMS), 8.2Hz (SHMS) - Expected pi/e ratio: up to 40/1 for the worst xbj bin - Expected total electron counts (3He gas yield N+ plus N-): 1M (HMS), 2.6M (SHMS)
Production Small angle (12.5 deg) HMS Low Momentum (HMS Kine 1)
Overview - We will run 2 days plus two shifts at HMS Kine 1; - For this setting, 75% of data will be taken with longitudinal target spin, 25% at transverse target spin; - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations; - We will take 1 hour of Empty Cell runs. - We will take 2 hours of Reference Cell N2 runs at 8 atm;
Setup - Beam Current: 30uA, raster always ON (5mm diameter) - Target: Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He - HMS: 12.5 deg, 5.7 GeV/c (electron) - SHMS: should be at kine D (see below) - Detectors: All SC bars ON
Procedure
- Expected 3He gas rate: 880Hz - Expected pi/e ratio: less than 1/1 - Expected total electron counts (3He gas yield N+ plus N-): 101M
Production Small angle (12.5 deg) HMS Low Momentum (HMS Kine 2)
Overview - We will run 5 days plus one shift at HMS Kine 2; - For this setting, 72% of data will be taken with longitudinal target spin, 28% at transverse target spin; - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations; - We will take 1 hour of Empty Cell runs. - We will take 2 hours of Reference Cell N2 runs at 8 atm;
Setup - Beam Current: 30uA, raster always ON (5mm diameter) - Target: Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He - HMS: 12.5 deg, 6.8 GeV/c (electron) - SHMS: should be at kine D (see below) - Detectors: All SC bars ON
Procedure
- Expected 3He gas rate: 500Hz - Expected pi/e ratio: low (<1/1) - Expected total electron counts (3He gas yield N+ plus N-): 115M
Production Small angle (12.5 deg) SHMS Resonance (SHMS Kine D)
Overview - We will run 8 days at SHMS Kine D; - For this setting, 72% of data will be taken with longitudinal target spin, 28% at transverse target spin; - Beam IHWP and Target Spin should be flipped routinely, providing same statistics for ++, +-, -+ and -- configurations; - We will take 1 hour of Empty Cell runs. - We will take 2 hours of Reference Cell N2 runs at 8 atm;
Setup - Beam Current: 30uA, raster always ON (5mm diameter) - Target: Polarized 3He Cell, Reference Cell -- Empty, filled with N2, filled with 3He - SHMS: 12.5 deg, 7.5 GeV/c (electron) - Detectors: All SC bars ON
Procedure - Expected 3He gas rate: 185Hz - Expected pi/e ratio: very low - Expected total electron counts (3He gas yield N+ plus N-): 64M