Pol He-3 Target Screen Setup
From HallCWiki
Revision as of 04:22, 11 December 2019 by Brads (talk | contribs) (→Setup target Polarimetry controls on POLHE4)
Pol He-3 Target Screen Setup
Setup target ladder, stripcharts on HCDESK4
To setup non-LabVIEW screens (stripcharts, target ladder, etc)
- Go to HCDESK4 (dual monitor linux host to the right of the TO station) and open a terminal on an empty workspace
- Run go_target
- Arrange the screens as shown in the snapshot
Setup target laser controls on POLTARCC
- Go to POLTARCC (single monitor linux host to the right in the corner of the TO station)
- Open a terminal on an empty workspace
- Run go_lasers'
- NOTE: This opens a VNC client that goes full screen. Hit the F8 key to exit the VNC screen if necessary.
- Double Click on the Laser Control icon in the top-middle of the desktop
FIXME: ADD A SCREEN SNAPSHOT WHEN ALL IS WORKING
Setup target Polarimetry controls on POLHE4
FIXME: ADD INSTRUCTIONS AND SCREEN SNAPSHOTS HERE WHEN ALL IS WORKING Just placeholders below.
How to do EPR_FM sweep
How to do EPR-AFP
How to take pNMR measurement
How to take NMR measurement
How to run the Lasers
LabVIEW software notes
Need to add what folder these can be found in.
EPR software
- EPR-RM sweep: EPR_FM_PIBOX_0_A1n_D2n.vi
- EPR-AFP: EPR_AFP_Modified_v3_A1n_D2n.vi
EPICS bindings
- Laser bindings (polhe1)
- Polarimetry bindings (polhe4)