5-pass optics for A1n

From HallCWiki
Revision as of 18:43, 13 February 2020 by Xiaochao (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
Goals 
 - To calibrate angle and ytar reconstruction of HMS/SHMS spectrometers.
 - Time: estimate 8 hours of 40uA beam total.
Setup
 - Beam Current:   40 uA CW, 0.5mm raster 
 - HMS setting: 30. deg, momentum: -2.0 GeV/c
 - SHMS setting: 30. deg, momentum: -2.0 GeV/c
 - Target:      Carbon Optics
 - Trigger:     3/4 trigger in both arms
 - Collimators: HMS (Sieve), SHMS (Centered Sieve)
Procedure
 - Assume that the beam center checkout is complete.
 - Set HMS/SHMS magnets to -2.0 GeV/c and they are at 30 deg.
 - Insert HMS Sieve and SHMS Centered Sieve.
 - Insert Carbon Optics target
 - Ask for 40uA and 0.5mm raster size.
 - Take one hour runs. 
 - At 40uA need 8 hours*40uA = 1.1C of beam.