Jump to navigationJump to searchRough / High-level sketch of d2n kinematic settings
Reduced kinematics list to accommodate limited beam time (dropped 1/4 of kinematics)
--------- Beam Params ---------- E_beam = 10.4 GeV/c I_beam = 30 uA P_targ = 0.50 P_beam = 0.80
--------- HMS ---------- E' theta x Q2 W *C -4.0 20.0 0.418 5.018 2.806 [Starting here] -- Only setting compatible with SOLID Cherenkov small-angle test. A -4.2 13.5 0.207 2.414 3.178 B -4.2 16.4 0.305 3.554 2.993
--------- SHMS ---------- E' theta x Q2 W *X -7.5 11.0 0.527 2.866 1.859 [Starting here] Y -6.4 14.5 0.565 4.240 2.036 Z -5.6 18.0 0.633 5.701 2.046
Run / Shift Schedule
- We started taking on Swing on Aug 7 (took a few days for beam to stabilize)
- Beam is scheduled to turn off 8am, Sept 21 (roughly 6 weeks) [1]
- Hall C Shift Schedule