Jan 07 2025

From HallCWiki
Revision as of 12:52, 7 January 2025 by Hanjie (talk | contribs)
Jump to navigationJump to search

Back to Main Page >> Weekly meetings

Agenda

Notes

  1. The network switch in the LAD bunker is ready to use (hasn't gotten a chance to use it)
  2. The CAEN1190 TDC module and the vmeDSC modules in the LAD crate are set up and seen by CODA
  3. Fixed the SHMS scaler gate cables; Still need to check the helicity scalers and scalers in coincidence mode (https://logbooks.jlab.org/entry/4324349)
  4. Fixed the SHMS ROC4 FADC data corruption issue (https://logbooks.jlab.org/entry/4324574)
  5. Jmirror removes data file too early for cosmic runs issue (https://logbooks.jlab.org/entry/4324487)
  6. HMS cosmic plots (https://logbooks.jlab.org/entry/4323675)
  7. SHMS cosmic plots (https://logbooks.jlab.org/entry/4325305)
  8. LAD update

To do:

  1. Need to run 3 LEMO cables between the SHMS hut and LAD bunker: two LAD triggers, EDTM; Bill will run 4 cables
  2. Set up vmeDSC configuration file
  3. GEM plan