Jan 07 2025
From HallCWiki
Jump to navigationJump to searchBack to Main Page >> Weekly meetings
Agenda
Notes
- The network switch in the LAD bunker is ready to use (hasn't gotten a chance to use it)
- The CAEN1190 TDC module and the vmeDSC modules in the LAD crate are set up and seen by CODA
- Fixed the SHMS scaler gate cables; Still need to check the helicity scalers and scalers in coincidence mode (https://logbooks.jlab.org/entry/4324349)
- Fixed the SHMS ROC4 FADC data corruption issue (https://logbooks.jlab.org/entry/4324574)
- Jmirror removes data file too early for cosmic runs issue (https://logbooks.jlab.org/entry/4324487)
- HMS cosmic plots (https://logbooks.jlab.org/entry/4323675)
- SHMS cosmic plots (https://logbooks.jlab.org/entry/4325305)
- LAD update
To do:
- Need to run 3 LEMO cables between the SHMS hut and LAD bunker: two LAD triggers, EDTM; Bill will run 4 cables
- Set up vmeDSC configuration file
- GEM plan