Jan 21 2025
From HallCWiki
Jump to navigationJump to searchBack to Main Page >> Weekly meetings
Agenda
Notes
- Use the 10 Gbps network switch in the LAD Bunker (labeled as "hallc-nps-sw-2022")
- Jmirror script is updated to touch the latest run so that the cosmic data file won't be transferred/deleted before run end
- Scaler data can be replayed (evtype=1) for both HMS and SHMS
- Helicity scaler data doesn't make sense (haven't looked into the problem yet)
- Cosmic replay
- FACD model 10 plotting scripts are ready to use (currently shows that the window is large)