Title

Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries


Days Requested for Approval

34 Physics + 11 Overhead


Experiment Halls *

C


Proposal Physics Goals

Indicate any Experiments that have physics goals similar to those in your proposal. Approved, Conditionally Approved, and/or Deferred Experiment(s) or proposals.

PR97-102 LOI12-14-002 PR12-15-005


Collaboration-Approved Proposals:

If you will be running in parallel with an approved experiment, please indicate the experiment number

N/A


Key Experiment Parameters

List Beam Energies and Beam Days: (e.g. 30 Days at 11 GeV, 20 Days at 8 GeV)

32.6 Days at 8.8 GeV 10.4 Days at 6.6 GeV 1.3 Days at 2.2 GeV


List Range of Beam Currents: (e.g. 10-60 mA)

80-90 nA


Indicate Major Apparatus: (e.g. CLAS12 & RICH, GLUEX, SHMS, HMS, SBS, SOLID)

HMS, SHMS, DNP Target


Contact Us

Spokespersons Spokeperson * Karl Slifer

Spokeperson * Patricia Solvignon

Spokeperson * Donal Day

Spokeperson * Dustin Keller

Spokeperson * Douglas Higinbotham

Name *

Elena Long

Institution

University of New Hampshire

Address

9 Library Way, DeMerritt Room 322

City, State, ZIP/County

Durham

Phone

6038625312

Fax

N/A

Email Address *

ellie@jlab.org

After saving, this email address will automatically receive an email that will provide information on how to update this proposal if needed before the deadline.


Author List

As of PAC 43, the author list section was added and should include the full first name, last name, institution, and author type of each author. Please select the CSV file that contains the authors list. Any author with the same first name, last name, and institution will be ignored.


Lab Resources List

List below significant resources - both in equipment and human - that you are requesting from Jefferson Lab in support of mounting and executing the proposed experiment. Do not include items that will be routinely supplied to all running experiments such as the base equipment for the hall and technical support for routine operation, installation, and maintenance.

Major Installations

Equipment

JLab/UVA DNP Target


Support Structures

Luminosity Monitor, temperature regulation and monitoring for BCMs, Faraday cup


Data Aquisition/Reduction

Support Structures

N/A

Software

N/A

Major Equipment

Magnets

DNP Superconducting Magnet

Power Supplies

~100A Magnet Power Supply for target

Targets

JLab/UVA DNP Target

Detectors

N/A

Electronics

N/A

Computer Hardware

N/A

Other Resources

Slow raster

Beam Requirement List '

Hall Liaison:

N/A

List all combinations of anticipated targets and beam considerations required to execute the experiment. (This list will form the primary basis for the Radiation Safety Assessment Document (RSAD) calculations that must be performed for each experiment.) support for routine operation, installation, and maintenance.

Beam Requirements: Add Beam Requirement Beam Energy(MeV) Mean Beam Current(µA) Polarization and Other Requirements Est Beam-On Time(hours) Target Materials & Thickness

2200 0.08 Unpolarized 25 ND3 3021

2200 0.08 Unpolarized 6 Carbon 3000

8800 0.08 Unpolarized 776 ND3 3000

8800 0.08 Unpolarized 6 Carbon 3000

6600 0.08 Unpolarized 244 ND3 3021

6600 0.08 Unpolarized 6 Carbon 3000

Hazard Identification Checklist

Check all items for which there is an anticipated need.

Cryogenics Electrical Equipment Radioactive Materials Pressure Vessels Special Target Materials Flammable Drift Container Other Target Materials Vacuum Vessels Radioactive Sources Large Mech. Structures Lasers Hazardous Materials General

Beamline Magnets
Analysis Magnets
Target Magnets

Type Superconducting Flow Rate 5 l/hr Capacity 101

Computing Requirement List

Silo/Mass Storage (Tape)

10 TB

Amount of Simulated Data Expected

50GB

Amount of Raw Data Expected(TB)

10

Amount of Processed Data Expected(TB)

50

Online Storage Disk Required (TB)

10

Imported Data Expected from Offsite Institution

N/A

Exported Data Expected to Offsite Locations

50GB

Computing

Simulation Requirements(SPEC CINT 2000hrs)

2000 hrs

Production(Replay, Analysis, Cooking) Requirements (SPEC CINT 2000hrs)

20,000 hrs

Other Requirements

Please add any additional information that will be useful for JLab's IT Division regarding unique configurations or that may require additional resources and/or coordination. Please indicate if possible what fraction of these resources will be provided by collaborating institutions and how much is expected to be provided by JLab.

N/A

Assumed Resource Requirements

Use this section to provide any information regarding the assumed requirements for the resources needed.

N/A