Fall 2017 Commissioning Plan

From HallCWiki
Jump to navigationJump to search

Table of Commissioning Tasks

Task Person Comment
Harp scans, BPM and raster checkout M. Jones
Final HMS and SHMS detector checkout plans. Defocused tune?
SHMS quartz plane S. Malace
HMS and SHMS trigger efficiency with Hodo, Hodo+ Cerenkov.
HMS and SHMS DC checkout, software alignment and tracking efficiency
Beam energy M. Jones, D. Mack
BCM Calibration D. Mack, D. Bhetuwal
Target Boiling D. Gaskell
Carbon elastic with sieve for final SHMS tune determination M. Jones, H. Szumila-Vance
Carbon elastic scan for delta matrix optimization H. Bhatt, D. Dutta
Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) M. Jones, H. Szumila-Vance
Sieve check after cycling SHMS magnets from positive to negative and back M. Jones
Determine SHMS central momentum and angle with set of elastic ep data. A. Karki, S. Basnet, D. Dutta
Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check. M. Jones, Temple student
GEM front sieve to better understand HB. Do optics with p+ to check optics. L. Kabir, D. Dutta
Coincidence timing checkout and optimization. B. Sawatzky, E. Pooser, C. Yero
Electronic dead time checkout B. Sawatzky, E. Pooser, C. Yero
Single Kaon production. Coincidence p and K production.

Fall 2017 Commissioning Plan

  • The plan will be base on the plan of the full SHMS/HMS commissioning.