Fall 2017 Commissioning Plan
From HallCWiki
Table of Commissioning Tasks
Task | Person | Comment |
Harp scans, BPM and raster checkout | M. Jones | |
HMS & SHMS hodoscope checkout | ||
SHMS quartz plane | S. Malace | |
HMS & SHMS DC checkout, software alignment and tracking efficiency | ||
HMS & SHMS 3/4 trigger efficiency checkout | ||
HMS & SHMS PID trigger efficiency checkout | ||
Beam energy | M. Jones, D. Mack | |
BCM Calibration | D. Mack, D. Bhetuwal | |
Target Boiling | D. Gaskell | |
Carbon elastic with sieve for final SHMS tune determination | M. Jones, H. Szumila-Vance | |
Carbon elastic scan for delta matrix optimization | H. Bhatt, D. Dutta | |
Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) | M. Jones, H. Szumila-Vance | |
Sieve check after cycling SHMS magnets from positive to negative and back | M. Jones | |
Determine SHMS central momentum and angle with set of elastic ep data. | A. Karki, S. Basnet, D. Dutta | |
Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check. | M. Jones, B. Duran | |
GEM front sieve to better understand HB. Do optics with p+ to check optics. | L. Kabir, D. Dutta | |
Coincidence timing checkout and optimization. | B. Sawatzky, E. Pooser, C. Yero | |
Electronic dead time checkout | B. Sawatzky, E. Pooser, C. Yero | |
Single Kaon production. Coincidence p and K production. |
Fall 2017 Commissioning Plan
- The plan will be base on the plan of the full SHMS/HMS commissioning.