Fall 2017 Commissioning Plan

From HallCWiki
Revision as of 16:52, 6 November 2017 by Jones (talk | contribs)
Jump to navigationJump to search

Fall 2017 Commissioning Plan

  • The plan will be base on the plan of the full SHMS/HMS commissioning.
  • Git repo with run plans for the various tasks. To contribute a plan, fork the repo to your githu account.

Table of Commissioning Tasks

Task Person Comment
Harp Scans, BPM and Raster Checkout M. Jones
HMS & SHMS Hodoscope Checkout S. Malace
HMS & SHMS 3/4 Trigger & TOF Efficiency Checkout S. Malace
SHMS Quartz Plane Checkout S. Malace
HMS & SHMS DC Checkout, Tracking Efficiency and Alignment H. Szumila-Vance, C. Yero
HMS & SHMS Heavy Gas Cherenkov Checkout E. Pooser, R. Ambrose
HMS & SHMS Pre-Shower/Shower Checkout H. Mkrtchyan, A. Asaturyan, V. Berdnikov
SHMS Aerogel Checkout H. Mkrtchyan, A. Asaturyan, V. Berdnikov
HMS & SHMS Trigger Efficiency Checkout B. Sawatzky, E. Pooser, C. Yero
Beam Energy M. Jones, D. Mack
BCM Calibration D. Mack, D. Bhetuwal
Target Boiling D. Gaskell
Carbon Elastic with Sieve for Final SHMS Tune Determination M. Jones, H. Szumila-Vance
Carbon Elastic Scan for Delta Matrix Optimization H. Bhatt, D. Dutta
Carbon Inelastics with Sieve for Ytgt, Y’tgt and X’tgt (Need 20 deg for Ytgt) M. Jones, H. Szumila-Vance
Sieve Check After Cycling SHMS Magnets from Positive to Negative and Back M. Jones
Determine SHMS Central Momentum and Angle with Set of Elastic ep Data A. Karki, S. Basnet, D. Dutta Heepcheck Planning
Inelastic Carbon Xn Measurements with Overlapping Momentum Settings for Acceptance Check M. Jones, B. Duran
GEM Front Sieve to Better Understand HB. Do Optics with p+ to Check Optics L. Kabir, D. Dutta
Coincidence Timing Checkout and Optimization B. Sawatzky, E. Pooser, C. Yero
Electronic Dead Time Checkout B. Sawatzky, E. Pooser, C. Yero
Single Kaon Production. Coincidence p and K Production