Spring 2018 Commissioning
From HallCWiki
Overview
Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here.
To-Do
- High Priority
- Configure Dave G. Dead time measurement scheme (Arrington’s and/or Morhings thesis)
- Configure NGC into SHMS PID trigger leg in place of HGC
- Sanity check SHMS hodoscope CAMAC power supply (noticed unstable behavior during end of fall run)
- Add SHMS PRSHWRSUM in trigger apparatus (FADC leaf)
- Remove layer B from HMS pre-shower sum
- Medium Priority
- Figure out DAC to mV conversion factor, find old talk regarding setting the DAC values to obtain pedestals a pre-determined value
- Include multi-hit capability in the trigger apparatus for reference times
- Integrate TI scalers into report files
- Configure OR of hodoscope trigger logic into TDC’s and scalers
- Change trigger leaf names to PRLO from PRSHWRLO etc. (needs to match xscaler)
- Low Priority
- Add number of FADC error flags to the report files (front and center)
- Add number of pulses identified in the window to data tree
DAQ/Trigger Run Plans
SHMS & HMS Mode 10 Runs
- SHMS Runs
Any kinematics, 100k events Any kinematics, 100k events, EDTM on at 100 Hz
- HMS Runs
Any kinematics, 100k events Any kinematics, 100k events, EDTM on at 100 Hz
Single Arm and Coincidence EDTM Studies
- SHMS Single arm EDTM runs at various rates
- SHMS Run: Any kinematics, EDTM at 10 Hz
- SHMS Run: Any kinematics, EDTM at 100 Hz
- HMS Single arm EDTM runs at various rates
- HMS Run: Any kinematics, EDTM at 10 Hz
- HMS Run: Any kinematics, EDTM at 100 Hz
- Coincidence EDTM runs at various rates
- Coincidence Run: Any kinematics, EDTM at 10 Hz
- Coincidence Run: Any kinematics, EDTM at 100 Hz
Trigger PID Threshold Scans
- SHMS PID threshold scan with NGC in trigger (HGC was previously utilized)
- NGCER 40, PRSH-LO 40, PRSH-HI 60
- NGCER 30, PRSH-LO 30, PRSH-HI 50
- NGCER 25, PRSH-LO 25, PRSH-HI 40
- NGCER 20, PRSH-LO 20, PRSH-HI 30
- NGCER 15, PRSH-LO 15, PRSH-HI 20
- NGCER 10, PRSH-LO 10, PRSH-HI 10
- HMS PID threshold scan
- CER 40, PRSH-LO 40, PRSH-HI 60, SH-LO 40 ---> These are the initial settings
- CER 30, PRSH-LO 30, PRSH-HI 50, SH-LO 30
- CER 25, PRSH-LO 25, PRSH-HI 40, SH-LO 25
- CER 20, PRSH-LO 20, PRSH-HI 30, SH-LO 20
- CER 15, PRSH-LO 15, PRSH-HI 20, SH-LO 15
- CER 10, PRSH-LO 10, PRSH-HI 10, SH-LO 10
Single arm SHMS & HMS runs with EL-REAL and EL-CLEAN being readout (need to time these in at the TI front panel)
- SHMS single arm multi-trigger type studies
- Any kinematics, 500k events, EDTM off
- Any kinematics, 500k events, EDTM on at 10 Hz
- HMS single arm multi-trigger type studies
- Any kinematics, 500k events, EDTM off
- Any kinematics, 500k events, EDTM on at 10 Hz