RC meeting and Run Plan, Wed Oct. 10

From HallCWiki
Revision as of 16:19, 10 October 2018 by Sjjooste (Talk | contribs)

Jump to: navigation, search
  • Status
    • Data taken so far [1]
    • Beam quality [2]
      • Beam issues, no data until 21:40pm
      • Lost ~90minutes due to beam dump water flow alert (see below).
  • Requiring attention
    • Around midnight beam dump water flow alert (flow too high) [3]
      • Ultimately resolved by masking [4]
      • BUT... around 10:30 downtime created for the same alert [5]
      • Again resolved by masking ...after 49 minutes
      • Need to make sure this gets communicated to the next crew if needed
  • Plans - Physics
    • Take data at Q2=3. W=3.14 x=0.25 theta_Shms=9.42 to reach 66% of desired stat. goal., then take Al.
      • Projected to take until tomorrow 4pm
    • Change SHMS angle to 6.48 deg, take Al and LH2 data
      • Coordinate with Holly in case we trigger rotation alarm.
      • Coordinate with Jay to see if we still need new limits for the ion chamber diffusors at this angle [6]
      • Projected to put us sometime in the weekend