Status

Time-Ordered Run Plan

  • Kin14.20 currently running
  • Kin14.21 ...

HMS: (same p, move 2.7 deg in) SHMS: (p from -2.58 to -2.53, angle from 30.0 to 14.0)

  • Kin17.6 SHMS stepping down in angle...
  • Kin17.5 ...
  • Kin17.4 ...

HMS: (p from -5.27 to -3.32, angle from 13.5 to 19.7) SHMS: (p up to -3.4, angle same)

  • Kin18.4 SHMS stepping up in angle...
  • Kin18.3 ...
  • Kin18.2 ...
  • Kin18.1 ...

SHMS POLARITY CHANGE

  • Kin18.8 SHMS stepping down in angle...
  • Kin18.7 ...
  • Kin18.6 ...
  • Kin18.5 ...

HMS: (p to -5.27, angle to 13.5) SHMS: (p down to -2.53, angle same)

  • Kin17.3

HMS: (p same, angle to 16.3) SHMS: (p to 3.44, angle to 8.0)

  • Kin13.5

SHMS POLARITY CHANGE (all else same)

  • Kin14.5


Reminders

  • Take one HMS monitoring run each shift
  • For all settings, for each target, split the desired charge between three runs
  • Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.

Issues

  • Shift workers needed in the next week (Shift Signup)
    • Day TO Sat/Sun
    • Owl shifts all next week!

Planned access to the hall

  • No Planned Accesses