Run plan for J/psi-007
From HallCWiki
Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Commissioning
Beam checkout
Detailed beam checkout instructions can be found here.
HMS | SHMS | TARGET | RADIATOR | I (uA) | RASTER | DURATION | Q (C) | TRIGGER | DAQ | STATUS | |||||
P | P | ||||||||||||||
Harp Scan | Empty | out | 5 | OFF | 0:15 | done | |||||||||
YAG: Beam spot | Empty | out | tune | OFF | 0:05 | done | |||||||||
YAG: Raster check | Empty | out | tune | 2x2 | 0:10 | done | |||||||||
Carbon hole | 4.712 | 17.08 | (-) | 5.389 | 15.81 | (-) | C-hole | out | 5 | 3x3 | 0:30 | 3/4 | sep. | done |
Detector checkout and calibrations
Additional instructions:
- We run both the COIN and separate DAQs during this phase!
- Inelastic measurement:
- Take 5min of MODE 10 data before starting the the inelastic measurement, then switch back to MODE 9.
- Coinc elastic:
- Take 5min of MODE 10 data before starting the the inelastic measurement, then switch back to MODE 9.
- Take pre-scaled 3/4 singles in both arms, set pre-scalers so the singles rate is <100Hz
- This run needs a special temporary trigger that will be connected to PS5
- Make sure sure PS5 = 0
HMS | SHMS | TARGET | RADIATOR | I (uA) | RASTER | DURATION | Q (C) | TRIGGER | DAQ | STATUS | |||||
P | THETA | P | THETA | ||||||||||||
Trigger checkout | 4.712 | 17.08 | (-) | 5.389 | 15.81 | (-) | LH2 | out | 70 | 2x2 | 0:15 | 3/4 | COIN | done | |
PID checkout | 4.712 | 17.08 | (-) | 5.389 | 15.81 | (-) | LH2 | out | 70 | 2x2 | 0:15 | 3/4 | COIN | done | |
PID checkout | 3.5 | 21 | (-) | 3.5 | 21 | (-) | LH2 | out | 70 | 2x2 | 0:15 | 3/4 | COIN | skip | |
ECAL calibration | 4.75 | 21 | (-) | 4.75 | 21 | (-) | LH2 | out | 70 | 2x2 | 0:15 | 3/4 | COIN | done | |
inelastic/ECAL calib | 4.1 | 21 | (-) | 3.5 | 25 | (-) | LH2 | out | 70 | 2x2 | ELREAL | sep. | done | ||
inelastic | 4.1 | 21 | (-) | 3.5 | 25 | (-) | Dummy | out | 40 | 2x2 | ELREAL | sep. | done | ||
optics (SIEVE) | 4.1 | 21 | (-) | 3.5 | 25 | (-) | Optics-1 | out | 65 | 2x2 | ELREAL | sep. | done |
Unscheduled single-arm Run Plan
COMPLETED
Replaces original radiator and production trigger checkout. Click here for the single-arm SHMS run plan
Coincidence calibration
- For mode 10 run: put HMS 3/4 + SHMS ELCLEAN into ps5, set DAQ to MODE10
- For next runs: revert DAQ to MODE 9, keep trigger the same
- When done with this measurements, revert ps5 to be HMS ELCLEAN + SHMS 3/4
HMS | SHMS | TARGET | RADIATOR | I (uA) | RASTER | DURATION | Q (C) | TRIGGER | DAQ | STATUS | |||||
P | THETA | P | THETA | ||||||||||||
Mode 10 | 4.618 | 27.18 | (+) | 6.826 | 18 | (-) | LH2 | out | 70 | 2x2 | 0:05 | ps5 (rev.) | COIN | ||
coinc elastic | 4.618 | 27.18 | (+) | 6.826 | 18 | (-) | LH2 | out | 70 | 2x2 | 0:30 | 0.13 | ps5 (rev.) | COIN | |
coinc elastic | 4.618 | 27.18 | (+) | 6.826 | 18 | (-) | Dummy | out | 40 | 2x2 | 0:10 | 0.02 | ps5 (rev.) | COIN |
Production
Production phase 1 (Production checkout and 66% of High-E/low-t point)
Additional instructions:
- High-E/low-t:
- Take 5min of MODE 10 data before starting each polarity, then switch back to MODE 9.
- Make sure to do at least one dummy run every shift
- Make sure to do at least one 30min radiator-out run every shift
- Make sure the production pre-scaler is set to 0
- Take pre-scaled 3/4 singles in both arms, set pre-scalers so the singles rate is <100Hz
HMS | SHMS | Target | Radiator | I (uA) | Raster | Duration | Q (C) | Trigger | DAQ | |||||
P | THETA | P | THETA | |||||||||||
High E/low t | 4.95 | 19.1 | (+) | 4.835 | 17 | (-) | LH2 | in | 70 | 2x2 | 8:00 | 2.02 | production | COIN |
High E/low t | 4.95 | 19.1 | (+) | 4.835 | 17 | (-) | Dummy | in | 40 | 2x2 | 2:45 | 0.40 | production | COIN |
High E/low t | 4.95 | 19.1 | (+) | 4.835 | 17 | (-) | LH2 | out | 70 | 2x2 | 1:20 | 0.34 | production | COIN |
test: Mid E/ low t | 4.6 | 19.9 | (+) | 4.3 | 20.1 | (-) | LH2 | in | 70 | 2x2 | 0:30 | 0.13 | 3/4 (HMS) + 3/4 (SHMS) | COIN |
test: high t | 4.08 | 16.4 | (+) | 3.5 | 30 | (-) | LH2 | in | 70 | 2x2 | 0:30 | 0.13 | 3/4 (HMS) + 3/4 (SHMS) | COIN |
optics HMS | 4.95 | 21.768 | (-) | 4.835 | 17 | (+) | Optics | out | 65 | 2x2 | 0:30 | 0.12 | ELREAL HMS | HMS |
High E/low t | 4.95 | 19.1 | (-) | 4.835 | 17 | (+) | LH2 | in | 70 | 2x2 | 8:00 | 2.02 | production | COIN |
High E/low t | 4.95 | 19.1 | (-) | 4.835 | 17 | (+) | Dummy | in | 40 | 2x2 | 2:45 | 0.40 | production | COIN |
High E/low t | 4.95 | 19.1 | (-) | 4.835 | 17 | (+) | LH2 | out | 70 | 2x2 | 1:20 | 0.34 | production | COIN |
Production phase 2 (66% of Mid-E/low-t point)
Additional instructions:
- Mid-E/low-t:
- Take 5min of MODE 10 data before starting each polarity, then switch back to MODE 9.
- Make sure to do at least one dummy run every shift
- Make sure to do at least one 30min radiator-out run every shift
- Make sure the production pre-scaler is set to 0
- Take pre-scaled 3/4 singles in both arms, set pre-scalers so the singles rate is <100Hz
HMS | SHMS | Target | Radiator | I (uA) | Raster | Duration | Q (C) | Trigger | DAQ | |||||
P | THETA | P | THETA | |||||||||||
Mid E/low t | 4.6 | 19.9 | (-) | 4.3 | 20.1 | (+) | LH2 | in | 70 | 2x2 | 16:00 | 4.03 | production | COIN |
Mid E/low t | 4.6 | 19.9 | (-) | 4.3 | 20.1 | (+) | Dummy | in | 40 | 2x2 | 5:30 | 0.79 | production | COIN |
Mid E/low t | 4.6 | 19.9 | (-) | 4.3 | 20.1 | (+) | LH2 | out | 70 | 2x2 | 2:40 | 0.67 | production | COIN |
test: high t | 4.08 | 16.4 | (-) | 3.5 | 30 | (+) | LH2 | in | 70 | 2x2 | 0:30 | 0.13 | 3/4 (HMS) + 3/4 (SHMS) | COIN |
Mid E/low t | 4.6 | 19.9 | (+) | 4.3 | 20.1 | (-) | LH2 | in | 70 | 2x2 | 16:00 | 4.03 | production | COIN |
Mid E/low t | 4.6 | 19.9 | (+) | 4.3 | 20.1 | (-) | Dummy | in | 40 | 2x2 | 5:30 | 0.79 | production | COIN |
Mid E/low t | 4.6 | 19.9 | (+) | 4.3 | 20.1 | (-) | LH2 | out | 70 | 2x2 | 2:40 | 0.67 | production | COIN |
Production phase 3 (50% of high-t point)
Additional instructions:
- high-t:
- Take 5min of MODE 10 data before starting each polarity, then switch back to MODE 9.
- Make sure to do at least one dummy run every shift
- Make sure to do at least one 30min radiator-out run every shift
- Make sure the production pre-scaler is set to 0
- Take pre-scaled 3/4 singles in both arms, set pre-scalers so the singles rate is <100Hz
HMS | SHMS | Target | Radiator | I (uA) | Raster | Duration | Q (C) | Trigger | DAQ | |||||
P | THETA | P | THETA | |||||||||||
high t | 4.08 | 16.4 | (+) | 3.5 | 30 | (-) | LH2 | in | 70 | 2x2 | 48:00 | 12.10 | production | COIN |
high t | 4.08 | 16.4 | (+) | 3.5 | 30 | (-) | Dummy | in | 40 | 2x2 | 16:30 | 2.38 | production | COIN |
high t | 4.08 | 16.4 | (+) | 3.5 | 30 | (-) | LH2 | out | 70 | 2x2 | 8:00 | 2.02 | production | COIN |
high t | 4.08 | 16.4 | (-) | 3.5 | 30 | (+) | LH2 | in | 70 | 2x2 | 48:00 | 12.10 | production | COIN |
high t | 4.08 | 16.4 | (-) | 3.5 | 30 | (+) | Dummy | in | 40 | 2x2 | 16:30 | 2.38 | production | COIN |
high t | 4.08 | 16.4 | (-) | 3.5 | 30 | (+) | LH2 | out | 70 | 2x2 | 8:00 | 2.02 | production | COIN |
Production phase 4
TBD based on results from first production phases and beam quality.