Status

  • The SHMS Calorimeter has been cabled with signal and HV.
  • Have checked setting each channel to 1400V that signal is seen.
  • Altered voltages within SHMS Calorimeter to match around 50 mV per tube.
  • Added external PMT's across top of calorimeter, 6 in total,
  • 06/28 Taking data for number of events through calorimeter and external PMT's
  • 07/10 Added diagram of Modules and Live connections
  • 07/18 Added plots of SHMS Cal. data

Computer Setup

  • Computer is called cnu. The account is gep5.

HV Setup

  • Can control the CAEN 403 through terminal on cnu.
    • Open terminal
    • type "su" to login as superuser.
    • type "minicom"
  • Listing of the HV setting and cable numbering for the preshower and scintillators
  • Preshower HV for Neg and for Positive side on July 30th at 4:41

Event Data

  • Coincidence data between SHMS Cal and external PMTs Hits per hour
  • Diagram of modules used for collecting coincidence data Module Diagram
  • Voltage versus PMT# plots for the negative and positive sides of the calorimeter. plot

Data taking Log

Run number Start Date/Time Trigger PreShower Threshold Scintillator Threshold End Date/Time Events HV figure Comments
34 July 30th 17:53:19 P1 && P14 20mV N/A July 31st 09:29:09 368 Pos HV] TDC range 1024ns (250ps/ch)
35 July 31st 09:37:27 P1 && P2 20mV N/A July 31st 10:29:10 2178 Pos HV] TDC range 1024ns (250ps/ch)
36 July 31st 14:29:14 P1 && P2 20mV N/A July 31st 14:35:00 144 Pos HV] TDC range 1024ns (250ps/ch power outage ending run)
37 July 31st 14:38:13 P1 && P2 20mV N/A July 31st 14:56:13 738 Pos HV] TDC range 1024ns (250ps/ch)
38 July 31st 15:26:35 P1 && P5 20mV N/A July 31st 15:47:02 119 Pos HV] TDC range 280ns (70ps/ch) power outage ending run
40 July 31st 19:43:43 P1 && P5 20mV N/A Aug 1st 10:24:51 6367 Pos HV] TDC range 280ns (70ps/ch)
41 Aug 1st 10:33:25 P1 && P2 20mV 50mV Aug 1st 11:04:16 1240 Pos HV Scint HV TDC range 280ns (70ps/ch) Added scintillators to the TDC with threshold = 50mV
42 Aug 1st 11:07:31 P1 && P2 20mV 50mV Aug 2nd 9:38:29 55941 Pos HV Scint HV TDC range 1024ns (250ps/ch)
43 Aug 2nd 9:52:34 P1 && P2 15mV 40mV Aug 2nd 11:46:39 9183 Pos HV] Scint HV TDC range 1024ns (250ps/ch)
44 Aug 2nd 11:55:03 P1 && P2 10mV 30mV Aug 2nd 15:02:54 28155 Pos HV] Scint HV TDC range 1024ns (250ps/ch)
45 Aug 2nd 15:45:12 P1 && P2 10mV 30mV Aug 2nd 17:26:06 26089 Updated Pos Preshower HV Scint HV TDC range 1024ns (250ps/ch) raised HV for bars 1,2,11 & 14
46 Aug 2nd 17:48:46 P1 && P6 10mV 15mV Aug 3rd 11:09:04 33524 Run 45 Preshower HV Scint HV TDC range 1024ns (250ps/ch)
47 Aug 3rd 11:10:29 P1 && P14 10mV 15mV Aug 3rd 14:43:08 1090 Run 45 Preshower HV Scint HV TDC range 1024ns (250ps/ch)
48 Aug 3rd 14:47:49 P2 && P14 10mV 15mV Aug 3rd 17:53:55 1243 Run 48 Preshower HV Run 48 Scint HV TDC range 1024ns (250ps/ch) Raised PSH1 HV, Scint Bot Mid HV
49 Aug 3rd 17:54:51 P2 && P14 10mV 15mV Aug 6th 10:24:59 25869 Run 49 Preshower HV Run 48 Scint HV TDC range 1024ns (250ps/ch)
50 Aug 6th 10:33:46 P2 && P14 20mV 15mV Aug 6th Aug 7th 09:31:34 Run 49 Preshower HV Run 48 Scint HV TDC range 1024ns (250ps/ch)