Run plan for VCS
From HallCWiki
Jump to navigationJump to searchE12-15-005 VCS experiment run plan is summarized in the table below:
HMS | SHMS | TARGET | I (uA) | RASTER | DURATION | Q (C) | TRIGGER | DAQ | STATUS | ||||||
P(MeV) | THETA(Deg) | P(MeV) | THETA(Deg) | ||||||||||||
Kin IIIb | 794.68 | 60.74 | 4034.44 | 7.68791 | LH2 | ||||||||||
KinIIIa | 794.68 | 27.99 | 4034.44 | 7.68791 | LH2 | ||||||||||
KinIa | 893.20 | 37.33 | 4034.44 | 7.68791 | LH2 | ||||||||||
KinIb | 893.20 | 51.40 | 4034.44 | 7.68791 | LH2 | ||||||||||
KinIIb | 859.89 | 55.52 | 4034.44 | 7.68791 | LH2 | ||||||||||
KinIIa | 859.89 | 33.21 | 4034.44 | 7.68791 | |||||||||||
Kin Va | |||||||||||||||
Kin Vb |