Instructions for shift crew

From HallCWiki
Revision as of 10:40, 15 July 2019 by Mboer (talk | contribs) (Created page with "1. Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam ON are steady Check the deadtime and the scaler in the 50k report file which is on: /home/cdaq...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

1. Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam ON are steady

Check the deadtime and the scaler in the 50k report file which is on:

/home/cdaq/vcs2019/hallc_replay_vcs/REPORT_OUTPUT/COIN/PRODUCTION/

2. Login to cdaql1 machine and go to hallc_replay directory if you are not there already:

> ssh cdaql1

> go_analysis

go_analysis will bring you to the vcs2019 directory.

3. Run standard HMS and SHMS coincidence replay after 50000 trigger and once after the run is done. Run:

> ./run_coin_hms.sh

> ./run_coin_shms.sh

It replays the most recent run and monitoring plots will automaticaly open. It will take the number of events that have been already accumulated.

- Check all the figures and compare them to the reference. If anything seems wrong, try to fix it, ask an expert if needed and make a log entry.

To replay a previous run or replay only with a limited number of events, do:

./run_coin_hms.sh <run_number> <number_of_event>

./run_coin_shms.sh <run_number> <number_of_event>

Give a number of events or "-1" for a full run replay.

4. Fill the run sheet for each run, including junk