2-pass commissioning

From HallCWiki
Revision as of 12:40, 27 November 2019 by Xiaochao (talk | contribs) (Created page with "== Beam Commissioning at 2-pass for Fall 2019 == === Beam checkout === === Detector checkout and calibrations ===")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Beam Commissioning at 2-pass for Fall 2019

Beam checkout

Detector checkout and calibrations