D2n Run Plan 2020
From HallCWiki
Rough / High-level sketch of d2n kinematic settings
Reduced kinematics list to accommodate limited beam time (dropped 1/4 of kinematics)
--------- Beam Params ---------- E_beam = 10.4 GeV/c I_beam = 30 uA P_targ = 0.50 P_beam = 0.80
--------- HMS ---------- E' theta x Q2 W *C -4.0 20.0 0.418 5.018 2.806 [Starting here] -- Only setting compatible with SOLID Cherenkov small-angle test. A -4.2 13.5 0.207 2.414 3.178 B -4.2 16.4 0.305 3.554 2.993
--------- SHMS ---------- E' theta x Q2 W *X -7.5 11.0 0.527 2.866 1.859 [Starting here] Y -6.4 14.5 0.565 4.240 2.036 Z -5.6 18.0 0.633 5.701 2.046
Run / Shift Schedule
- We started taking on Swing on Aug 7 (took a few days for beam to stabilize)
- Beam is scheduled to turn off 8am, Sept 21 (roughly 6 weeks) [1]
- Hall C Shift Schedule
Data Collection Status
- Data collection status is best monitored using
d2n_status_table
on cdaq@cdaql1
- Data collection status is best monitored using
[cdaq@cdaql1 ~]$ go_analysis pro cdaq@cdaql1:~/polhe3/production/hallc_replay$ d2n_status_table
- That table is also posted to the HCLog every shift with the subject "Recent SHMS and HMS run list".
- You can use the
Hall C Run List Summaries
link under the HCLog Useful Links sidebar on the right as a shortcut.
- The runtimes and estimated yields are based on Rate Estimate Updates (19 Mar 2020) by Wolfgang
- (NOTE: Ignore the primed kinematics in the file, they are not relevant anymore.)
Special Runs
BCM Calibration-- CompleteBulls Eye Scan-- Done for A1n (do we want a repeat?)- Beam Energy Measurement
5-pass Production Procedure
- SHMS and HMS runs are independent, but are run in pairs that should reflect similar rates (when posible)
- Run time for each of the 3 kinematic pairs is roughly 125 PAC hours, ~10 calendar days/pair
- General considerations
- Flip IHWP every 4--8 hours (coordinate with Hall A) - Ensure Charge Asym Feedback is running/working (watch the stripcharts and coordinate with Hall A) - Take NMR meas. every ~5 hours - Schedule a Moller run roughly every week - Target spin rotations/tests should be done immediately prior to the Moller so target has time to spin back up -
- Reference cell runs needed for all Kinematics (nominal 2--4 hours per
- Reference cell Nitrogen [135 psig] (Insert when we need time to spin up Polarized Cell) - Reference cell Hydrogen [135 psig] (Insert when we need time to spin up Polarized Cell) - Reference cell Vacuum [0 Torr] (Insert when we need time to spin up Polarized Cell) - Reference cell He3 [135 psig] (NOTE: Make best use of He3 by running this last in first kinematic, then first in next kinematic!)
- Polarized 3He Target • Transverse (90, 270) • Total run time 8--10 days
- Flip target spin after 3--4 days - Run 3--4 more days with the opposite target spin
- Polarized 3He Target • Longitudinal (0, 180) • Total run time ~1--1.5 days
- Flip IHWP at 1/2 way into each run block (~4 hours) - ~11 hours @ 0deg - ~11 hours @ 180deg
1-pass Running
- Pass change to 1-pass: 8am Monday, August 24
- Pass change to 5-pass: 8am Thursday, August 27
- That is a nominal 64 hours (assuming 8 hours for pass change)
- A1n 1-pass notes:
https://hallcweb.jlab.org/wiki/index.php/1-pass_calibration_for_A1n_(Jan_2020) https://hallcweb.jlab.org/wiki/index.php/1-pass_calibration_for_A1n
- Verify the following well before 1-pass period
- Confirm SHMS + HMS 1-pass optics is good! - Ensure the 1-pass analysis scripts are ready (Scott, Chao) - Chao emailed back that he's looking into it now - Confirm the T2/T3 trigger (3/4+cher) is ready to go
- Necessary Prep work during Hall Controlled Access (schedule with RadCon in advance)
- Install collimators (JP, RadCon) - Check on EPR photo-diode status, likely replace it (RadCon) - Ensure fast raster is reconfigured correctly (Expert: Jones, Gunning) - "Have MCC click on the button on the Expert page for 1 coil (instead of 2 coils). Ensure "gbeam_pass1_jan2020.param" is used for analysis"
- Moller Measurement ASAP (allow target to spin up after above prep work)
- Turn off SHMS/HMS bars following A1n example
https://logbooks.jlab.org/entry/3756736 https://logbooks.jlab.org/entry/3760238
1-pass Runs
- Pressure curves (~ 6 hours)
- Record ref cell pressure before and after each run! - He3 : 10, 8, 4, 2, 1, 0.5 atm (20 min/run) -- 2 hours + overhead - Nitrogen : 10, 8, 4, 2, 1, 0.5 atm (20 min/run) -- 2 hours + overhead
- Hydrogen elastic [10 atm] (1 hour)
- Reference Cell vacuum (2 hours)
- Pol He3 Delta Transverse ( 4--8 hours )
- Pol He3 Elastic and QE longitudinal Asyms ( 4--8 hours )
* Pol He3 Elastic group has run simulations and recommend that we start with the SHMS at 11deg (instead of 8.5deg). - That shows an equal or better FoM, and we are less exposed to the high-rate backgrounds, and will /not/ require extra staff support and time to rotate SHMS to that angle.
- Collect our baseline Pol He3 Elastic asym at 11 deg, then continue with the Pol He3 Elastic group's run plan (stepping the SHMS out in angle) until we run out of beam time. - HMS will remain parked at around 18.5 degrees