RC Daily Meetings are at 10 am, remote connection link: https://bluejeans.com/861439920

Accelerator Status

  1. Beam was off 09:45-13:30 on Sunday for a magnet issue that only impacted Hall C. Otherwise, steady production on day/swing/owl.
  2. Pass change for Hall A is definitely Monday.
  3. Regarding the Secretary of Energy tour, VIP schedules can change unexpectedly, but the last info we were given was that the accelerator will be off 09:30 Monday morning. Tours wrap up at 13:30.

Hall C Status

  1. We had good production at ~42muA starting 18:15 on Saturday, and continuing into Sunday day shift.
  2. Immediately before that, there was no beam delivery to Hall C during 16:30-18:15. And most of Saturday day shift I would call QBU (questionable beam in use during 09:00-16:30) since our beam current varied from 6-40 muA while MCC was working the issue of BLM trips when trying to deliver requested currents to both Halls A and C.
  3. Number of good pions was 4629 as of 08:00 Sunday. See Ali's hclog https://logbooks.jlab.org/entry/3931371

Current Run Plan

  1. Continue data taking until early Nov

Current Issues

  1. Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) ( PENDING )
  2. Q3 insulating vacuum spikes generating alarms. For example, https://logbooks.jlab.org/entry/3930175 .
  3. One HB LHe incident of note: https://logbooks.jlab.org/entry/3929152 . (possible clue to the origin?)
  4. Target ladder camera was identified to be bad: Joe Beaufait will order camera ( PENDING )
  5. Still running with no UPS on the SHMS cryo controls - Steve L. has ordered batteries and UPS. ( PENDING )
  6. HCCAM02 not functioning (lift required to replace).

Special Requests

Useful Links