RC Daily Meetings are at 10 am, remote connection link: https://bluejeans.com/861439920
Accelerator Status
- Beam was off 09:45-13:30 on Sunday for a magnet issue that only impacted Hall C. Otherwise, steady production on day/swing/owl.
- Pass change for Hall A is definitely Monday.
- Regarding the Secretary of Energy tour, VIP schedules can change unexpectedly, but the last info we were given was that the accelerator will be off 09:30 Monday morning. Tours wrap up at 13:30.
Hall C Status
- We had good production, mostly at 40-42muA. Hall C beam current was reduced to 30muA for a couple hours when Hall A was increased from 3 to 6 muA.
- Number of good pions was ???
Current Run Plan
- Continue data taking until early Nov
Current Issues
- Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) ( PENDING )
- Q3 insulating vacuum spikes generating alarms. For example, https://logbooks.jlab.org/entry/3930175 .
- One HB LHe incident of note: https://logbooks.jlab.org/entry/3929152 . (possible clue to the origin?)
- Target ladder camera was identified to be bad: Joe Beaufait will order camera ( PENDING )
- Still running with no UPS on the SHMS cryo controls - Steve L. has ordered batteries and UPS. ( PENDING )
- HCCAM02 not functioning (lift required to replace).