August 8, 2022
From HallCWiki
Jump to navigationJump to search
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
- Shift Signup (Read only)
- PionLT_2022_Physics_Status
- KaonLT Logbook - Used for PionLT updates too
- Physics analysis updates should be cross posted here
- Run Plans
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
Current Status
- Completed Q2=3.85, W=2.62, high epsilon (pi-) setting around midnight last night.
- Started Q2=6, W=2.4 left on OWL shift. Rate was about 1700 pions/hour, suggesting 14-15 hours needed just for this SHMS angle.
- At 7:30, switched to SHMS center setting (Q2=6, W=2.4 pi-). Rate appears to be a little higher, 1857 pions for a 1 hour run. But we are aiming for higher statistics at this setting, so full statistics will take about 16 hours (not including dummy).
Current Run Plan
- Keep taking data at this setting.
- To be discussed at RC meeting: I suggest switching the CaFe optics no later than middle of swing shift. Then if time allows, switch back to production after the Heep singles running.
Notices in Effect for Shift Crew
Current Issues
- Coffee maker broken! Emergency instant coffee in Counting House.
- Shifts filled until August 14 - then we have OWL shifts available up to August 19. Lots of openings August 20++.
Planned Accesses to the Hall
- Maintenance day still scheduled for Thursday, so access may be possible during that time.
- Aerogel change - still need to finalize day, but it seems likely we won;t be ready for this before the weekend.
Planned Accelerator Configuration Changes
- Pass change on Tuesday.
- Pass change (4->3) next week. On nominal beam schedule was to take place Monday (Aug. 15). Told PD that this will likely need to be moved one day.