August 24, 2022

From HallCWiki
Revision as of 09:52, 24 August 2022 by Sjdkay (Talk | contribs) (Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> * Zoom remote connection informa...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

Current Run Plan

  • Arc energy measurement is ongoing
  • After the arc energy measurement, run the Q2=1.60 W=3.08 x=0.15 low epsilon SHMS Left (7.50) LH2+ setting (page 33)
  • Once this is done, finish HeePCoin #4 and #5 (pages 16 and 18 of the run plan), including dummy runs
  • After HeePCoin, it's negative polarity time, we move to page 40 of the run plan and work our way through the last 9 pages of the run plan

Notices in Effect for Shift Crew

  • If all SHMS magnets crash at the same time, push the SHMS dipole crash button (on the rack above the target heater manual controls and target temperature readbacks).
  • For physics settings that come in quickly, please see - Analysis Note #1 Analysis Note #2
  • SHMS Q1 Vacuum Spikes - Follow the guidance
  • Please see updated CoVID guidance in the recent CoVID guidance update

Current Issues

  • SHMS Q1 Vacuum Spikes - Follow the guidance
  • Weird polarity flip alarms still occurring
  • More white alarms (BCM temp and raster again)

Planned Accesses to the Hall

  • None planned yet
  • Rotation to 6.00 degrees will be coming up (page 44 of the run plan)
    • Given how long the next few settings are, this is likely going to be next week or later

Special Requests

  • Fix coffee machine, or replace
    • Rolf has the same supernatural abilities as Bill and has managed to fix it... for now.
  • Beam energy measurement - Today! (24/8)