Elong-13-05-02

From HallCWiki
Revision as of 13:07, 3 May 2013 by Ellie (talk | contribs) (New page: ==Rates Update== Rates code now matches what Patricia gets. The issue was in the spectrometer acceptance -- I was using a larger acceptance based on old calculations of what the SHMS could...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Rates Update

Rates code now matches what Patricia gets. The issue was in the spectrometer acceptance -- I was using a larger acceptance based on old calculations of what the SHMS could do. This has been fixed, the points on Azz and b1d have been moved to the central x value that the range is over, and the dark points on the kinematics plots show where the spectrometers will sit. This is using what I've called Azz method 2 to calculate the uncertainties.

PAC = 50% Time Efficiency

2013-05-02-50percent.png


PAC = 100% Time Efficiency

2013-05-02-100percent.png