February 22, 2023

From HallCWiki
Revision as of 10:44, 22 February 2023 by Reinhold (talk | contribs) (Created page with "= Under Construction = = RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> * Zoom r...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Under Construction

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Summary

  • finished closing the hall about 4 pm
  • set spectrometers to CAFE kinematics
  • checked beam with harp scans and hole target
  • checked and adjusted coincidence trigger with LH2 target
  • took carbon "mean field" data
  • ~10: 30 am moved to gold target

Current Status

  • target is cooling down; expected to have condensed targets by Tuesday afternoon
  • reeastablished coincidence trigger for CAFE
  • HMS spectrometer rotation being done right now; Solid "bunker" already relocated; moving HMS to 30 deg and then relocate solid detector
  • earlier CAFE folks had a meeting to settle on their runplan.

Current Run Plan

  • Once we get beam back, run two days for CAFE
  • then start deuteron experiment

Issues/updates

  • LH2 loop has a problematic fan motor controller; dumps too much power into target; current limited to ~ 20 uA; probably need to warm up LH2 before accepting 40 uA on LD2

Current Issues

Planned Accesses to the Hall

  • none planned; will the LH2 warmup require an access?