October 5, 2023

From HallCWiki
Revision as of 08:20, 5 October 2023 by Wmhenry (talk | contribs) (→‎Summary)
Jump to navigationJump to search

Back to the calendar

RC Meeting Information

Current RC: Iuliia Skorodumina

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Zoom remote connection information:
Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
Meeting ID: 161 701 5555
Passcode: 288953

Useful Links

Summary

Wednesday (10/03) Day, Swing and OWL this morning shifts we were smoothly taking production data on LH2, LD2, and dummy (

Middle Swing we had Q1 trip when the NPS magnet was powered off before ramping to zero [1] The current plan is to continue running at the KinC_x50_2 production setting. We need to stay at this setting for the total of ~2 days of running.

Run plan

The run plan is available here: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan

Note the simplified table of the upstream and downstream corrector currents vs. SHMS angle uploaded by Dave Gaskell. The shift workers should be able to use this table to provide starting values for the corrector currents when MCC executes the NPS sweeper setup procedure at a new configuration.


Future plans

  • We need to stay at KinC_x50_2 production setting for the total 3 days of running.
  • Moller measurement.
  • Access at end of week to install new "26 deg wings" on the Sweep Magnet.