To Do List, Assignments

From HallCWiki
Revision as of 13:48, 11 May 2016 by Simona (talk | contribs)
Jump to navigationJump to search
  • Spokespeople for E12-10-002


    • Simona Malace - spokesperson, contact
    • Eric Christy - spokesperson
    • Thia Keppel - spokesperson
    • Ioana Niculescu - spokesperson


  • To Do List/Assignments


    • 'In preparation for running:'


      • Production Run Plan - S. Malace
        • Choice of kinematics
        • Radiative corrections calculation
        • Charge-symmetric background calculation
        • Pion rates calculation
        • Estimation of detector rates
        • Summary of trigger setup: trigger configuration, thresholds for various detectors
        • Trigger rates
        • Order of kinematic production running
        • Coordinate with Dave Gaskell for combined E12-10-002/E12-10-008 running


      • Non-production run plan
        • Elastics
        • BCM calibrations
        • Luminosity scans
        • What else?


      • Online analysis coordination - Simona Malace
        • Calibrations codes ready
        • Codes to monitor quality of data online: check deadtimes, efficiencies and quality of calibrations
        • Hcana working and ready for online replay
        • MC ready to produce acceptance corrections
        • Cross sections code ready for online cross section


      • Items needed for efficient running
        • Shift checklist: create/post on wiki
        • Run sheets: create/post on wiki
        • Post run plan on wiki - S. Malace
        • Post on wiki procedures/how to's (+ most common problems and how to solve them) for:
          • HV operation
          • Beam restoration: BeO, harp scan, C-hole run, bull's eye scan etc.
          • CODA running
          • Change of spectrometers momenta
          • Change of the spectrometers angle
          • Online histograms monitoring