Elong-2016-06-02
Title Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries
Days Requested for Approval
34 Physics + 11 Overhead
Experiment Halls *
C
Proposal Physics Goals:
Indicate any Experiments that have physics goals similar to those in your proposal. Approved, Conditionally Approved, and/or Deferred Experiment(s) or proposals.
PR97-102 LOI12-14-002 PR12-15-005
Collaboration-Approved Proposals:
If you will be running in parallel with an approved experiment, please indicate the experiment number
N/A Key Experiment Parameters
List Beam Energies and Beam Days: (e.g. 30 Days at 11 GeV, 20 Days at 8 GeV)
32.6 Days at 8.8 GeV 10.4 Days at 6.6 GeV 1.3 Days at 2.2 GeV List Range of Beam Currents: (e.g. 10-60 mA)
80-90 nA Indicate Major Apparatus: (e.g. CLAS12 & RICH, GLUEX, SHMS, HMS, SBS, SOLID)
HMS, SHMS, DNP Target Contact Us
Spokespersons
Add Spokeperson Spokeperson * Karl Slifer Remove Spokeperson * Patricia Solvignon Remove Spokeperson * Donal Day Remove Spokeperson * Dustin Keller Remove Spokeperson * Douglas Higinbotham Remove Name *
Elena Long Institution
University of New Hampshire Address
9 Library Way, DeMerritt Room 322 City, State, ZIP/County
Durham Phone
6038625312 Fax
N/A Email Address *
ellie@jlab.org After saving, this email address will automatically receive an email that will provide information on how to update this proposal if needed before the deadline.
Author List
As of PAC 43, the author list section was added and should include the full first name, last name, institution, and author type of each author. Please select the CSV file that contains the authors list. Any author with the same first name, last name, and institution will be ignored. File Format
Click here to view a sample file
Accepted extensions list: .csv .txt Choose File Clear Proposal's Authors List This section contains the saved proposal's authors.
Proposal does not contain any authors. To add an author follow the directions at the beginning of this section Lab Resources List
List below significant resources - both in equipment and human - that you are requesting from Jefferson Lab in support of mounting and executing the proposed experiment. Do not include items that will be routinely supplied to all running experiments such as the base equipment for the hall and technical support for routine operation, installation, and maintenance.
Major Installations
Equipment
JLab/UVA DNP Target Support Structures
Luminosity Monitor, temperature regulation and monitoring for BCMs, Faraday cup Data Aquisition/Reduction
Support Structures
N/A Software
N/A Major Equipment
Magnets
DNP Superconducting Magnet Power Supplies
~100A Magnet Power Supply for target Targets
JLab/UVA DNP Target Detectors
N/A Electronics
N/A Computer Hardware
N/A Other Resources
Slow raster Beam Requirement List
Hall Liaison:
N/A List all combinations of anticipated targets and beam considerations required to execute the experiment. (This list will form the primary basis for the Radiation Safety Assessment Document (RSAD) calculations that must be performed for each experiment.) support for routine operation, installation, and maintenance.
Beam Requirements: Add Beam Requirement Beam Energy(MeV) Mean Beam Current(µA) Polarization and Other Requirements Est Beam-On Time(hours) Target Materials & Thickness Remove 2200
0.08
Unpolarized
25 Target Materials (1) Add Target Material
ND3
3021
Remove Remove 2200
0.08
Unpolarized
6 Target Materials (1) Add Target Material
Carbon
3000
Remove Remove 8800
0.08
Unpolarized
776 Target Materials (1) Add Target Material
ND3
3000
Remove Remove 8800
0.08
Unpolarized
6 Target Materials (1) Add Target Material
Carbon
3000
Remove Remove 6600
0.08
Unpolarized
244 Target Materials (1) Add Target Material
ND3
3021
Remove Remove 6600
0.08
Unpolarized
6 Target Materials (1) Add Target Material
Carbon
3000
Remove Hazard Identification Checklist
Check all items for which there is an anticipated need.
Cryogenics Electrical Equipment Radioactive Materials Pressure Vessels Special Target Materials Flammable Drift Container Other Target Materials Vacuum Vessels Radioactive Sources Large Mech. Structures Lasers Hazardous Materials General
Beamline Magnets Analysis Magnets Target Magnets
Type Superconducting Flow Rate 5 l/hr Capacity 101 Computing Requirement List
Silo/Mass Storage (Tape)
10 TB Amount of Simulated Data Expected
50GB Amount of Raw Data Expected(TB)
10 Amount of Processed Data Expected(TB)
50 Online Storage Disk Required (TB)
10 Imported Data Expected from Offsite Institution
N/A Exported Data Expected to Offsite Locations
50GB Computing
Simulation Requirements(SPEC CINT 2000hrs)
2000 hrs Production(Replay, Analysis, Cooking) Requirements (SPEC CINT 2000hrs)
20,000 hrs Other Requirements Please add any additional information that will be useful for JLab's IT Division regarding unique configurations or that may require additional resources and/or coordination. Please indicate if possible what fraction of these resources will be provided by collaborating institutions and how much is expected to be provided by JLab.
N/A Assumed Resource Requirements Use this section to provide any information regarding the assumed requirements for the resources needed.
N/A